Laserfiche WebLink
<br /> UnR Contract Contract To Date To Date \ <br />No. Item Unit Price Quantity Amount Quantity Amount <br />26 UNILOADER - SKIDSTEER HR $72.00 40.00 $2,880.00 38.00 $2,736.00 <br />2123.505 <br />27 DOZER HR $tt2.00 40.00 $4,480.00 32.00 $3.584.00 . <br />2123.509 <br />28 TANDUM DUMP TRUCK HR $70.00 40.00 $2,800.00 24.00 $1,680.00 <br />2123.510 <br />29 FRONT END LOADER HR $118.00 40.00 $4,720.00 24.00 $2,832.00 <br />2123.514 <br />30 TRACTOR MOUNTED BACKHOE HR $90.00 40.00 $3,600.00 0.00 $0.00 <br />2123.601 <br />31 STREET SWEEPER (WITH PICKUP BROOM) HR $125.00 35.00 $4,375.00 32.00 $4,000.00 <br />2123.610 <br />32 AGGREGATE BASE, CLASS 5 TON $10.30 500.00 $5.150.00 750.00 $7,725.00 <br />2211.501 <br />33 AGGREGATE BASE (CV), CLASS 5 (P) CY $25.62 1 ,975.00 $50,599.50 1,975.00 $50,599.50 <br />2211.503 <br />34 CONCRETE PAVEMENT SY $27.00 1,375.00 $37,125.00 1.286.00 $34,722.00 <br />2301-501 <br />35 STRUCTURAL CONCRETE CY $83.00 25.00 $2,075.00 0.00 $0.00 <br />2301.511 <br />36 STRUCTURAL CONCRETE, HE CY $91.00 205.00 $18,655.00 214.00 $19,474.00 <br />2301.513 <br />37 REINFORCEMENT BARS (EPOXY COATED) LB $1.00 1,000.00 $1,000.00 108.00 $108.00 <br />:2301.529 <br />38 BITUMINOUS DRIVEWAY SY $14.00 2.075.00 $29.050.00 2,151.00 $30.114.00 <br />2331.604 <br />39 6" CONCRETE DRIVEWAY SY $41.00 500.00 $20,500.00 685.00 $28.085.00 <br />2531.507 <br />40 BITUMINOUS MATERIAL FOR TACK COAT GAL $1.80 307.00 $552.60 425.00 $765.00 . <br />2357.502 <br />41 TYPE LVWE35030C WEARING COURSE MlxrURE TON $41.00 685.00 $28,085.00 695.00 $28,495.00 <br />2350.501 <br />42 TYPE LVNWE35030C BASE COURSE MlxrURE TON $41.00 685.00 $26,085.00 723.00 $29,643.00 <br />2350.502 <br />43 AGGREGATE BEDDING MATERIAL (CV) CY $30.00 50.00 $1,500.00 0.00 $0.00 <br />2451.509 <br />44 ADJUST CURB STOP BOX EA $200.00 5.00 $1 ,000.00 3.00 $600.00 <br />2504.602 <br />45 ADJUST GATE VALVE EA $300.00 5.00 $1,500.00 0.00 $0.00 <br />2521.511 <br />46 CONCRETE CURB & GUTTER DESIGN B618 LF $7.80 6,185.00 $48,243.00 5,195.00 $40,521.00 <br />2531.501 <br />47 6" CONCRETE DRIVEWAY APRON SY $41.00 482.00 $19,762.00 463.00 $18,983.00 <br />2531.507 <br />48 CONCRETE PEDESTRIAN RAMP EA $600.00 4.00 $2,400.00 4.00 $2,400.00 <br />2531.602 <br />49 7" CONCRETE V ALLEY GUTTER LF $15.00 80.00 $1,200.00 45.00 $675.00 <br />2531.603 <br />50 MODULAR BLOCK RETAINING WALL SY $180.00 85.00 $15,300.00 70.00 $12.600.00 <br />2563.601 <br />51 FURNISH AND I NST ALL MAILBOX AND SUPPORT EA $64.00 43.00 $2,752.00 0.00 $0.00 <br />2540.002 <br />52 INSTALL MAILBOX EA $50.00 43.00 $2,150.00 43.00 $2,150.00 <br />2540.602 <br />53 REVISE SIGNAL SYSTEM SYS $8,300.00 1.00 $8.300.00 1.00 $8.300.00 . <br />2565.604 <br /> Page 4 019 <br />