Laserfiche WebLink
<br /> Unft Contract Contract To Date To Date <br />No. nem Unn Price Quantity Amount Quantity Amount <br />54 TRAFFIC CONTROL LS $2,200.00 1.00 $2,200.00 1.00 $2,200.00 <br />2563.601 <br />.~NSTALL SIGN TYPE C EA $100.00 2.00 $200.00 2.00 $200.00 <br />56 F & I SIGN PANEL TYPE C SF $31.00 28.00 $868.00 36.20 $1,122.20 <br />2564.531 <br />57 BALE CHECK EA $6.00 200.00 $1,200.00 0.00 $0.00 <br />2573.501 <br />58 SILT FENCE. TYPE HEAVY DUTY LF $2.80 1,090.00 $3,052.00 700.00 $1,960.00 <br />2573.502 <br />59 ROCK CONSTRUCTION ENTRANCE EA $100.00 2.00 $200.00 0.00 $0.00 <br />2573.602 <br />60 3'x6' CROSSWALK PAVEMENT - EPOXY MARKING SY $10.00 8.00 $80.00 0.00 $0.00 <br />2564.604 <br />61 12- STOP BAR - EPOXY MARKING LF $50.00 2.00 $100.00 0.00 $0.00 <br />".."" <br />62 SEEDING AC $1,600.00 0.30 $480.00 0.50 $800.00 <br />2575.501 <br />63 SODDING, TYPE LAWN SY $2.80 10.186.00 $28,520.80 10,096.00 $28,268.80 <br />2575.505 <br />64 MULCH MATERIAL TYPE 1 TON $130.00 3.00 $390.00 5.00 $650.00 <br />2575,511 <br />65 DISK ANCHORING AC $400.00 0.30 $120.00 0.50 $200.00 <br />2575.519 <br />66 COMMERCIAL FERTILIZER ANALYSIS 22-5-10 LB $0.50 450.00 $225.00 400.00 $200.00 <br />2575.532 <br />67 CONSTRUCTION FENCE LF $3.00 150.00 $450.00 150.00 $450.00 <br />2575.603 <br />. Subtotal: $601,512.36 $585,600.66 <br />Schedule: B. STORM SEWER <br /> Unft Contract Contract To Date To Date <br />No. nem Unit Price Quantity Amount Quantity Amount <br /> CLEARING AC $1,850.00 1.50 $2,775.00 0.90 $1,665.00 <br />2101.501 <br />2 GRUBBING AC $1,850.00 1.50 $2,775.00 0.90 $1,665.00 <br />2101.506 <br />3 REMOVE RCP PIPE SEWER (STORM) LF $15.00 245.00 $3,675.00 166.00 $2,490.00 <br />2104.501 <br />4 REMOVE CMP PIPE CULVERTS ANO APRONS LF $15.00 100.00 $1,500.00 102.00 $1,530.00 <br />2104.501 <br />5 REMOVE DRAINAGE STRUCTURE EA $525.00 5.00 $2,625.00 6.00 $3.150.00 <br />2101.509 <br />6 REMOVE RCP APRON EA $320.00 4.00 $1,280.00 2.00 $640.00 <br />2104.509 <br />7 COMMON CHANNEL EXCAVATION CY $12.64 1120.00 $14,156.80 1.500.00 $18,960.00 <br />2105..511 <br />8 12" RC PIPE APRON EA $320.00 3.00 $960.00 3.25 $1,040.00 <br />2501.515 <br />9 21" RC PIPE APRON EA $440.00 1.00 $440.00 1.00 $440.00 <br />2501.515 <br />_0 27" RC PIPE APRON EA $630.00 1.00 $630.00 1.00 $630.00 <br />501.515 <br />11 12' TRASH GUARD FOR 12" PIPE APRON EA $260.00 2.00 $520.00 6.28 $1,632.80 <br />2501.602 <br /> Page 5 019 <br />