My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-29-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
08-29-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:46 AM
Creation date
11/14/2006 4:25:45 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Arden Hills City Council <br />cc. Peter HeUegers <br /> <br />. <br /> <br />August 21,2005 <br /> <br />Dear Council members, <br /> <br />Our construction plans and action have been delayed by health issues. Over the last 12 <br />months I have been dealing with a series of severe respirtory problems. Resolving the <br />health issues has been our priority. We have found insulation for sound gathering dust <br />and possibly mold in our refrigerator and near the electronic air cleaner. The furnace and <br />refrigerator have been replaced and testing is in process to be sure the rest of the house is <br />clear. I'm working with my physician to determine what health issues might <br />enviornmentally related and evaluating other possible causes. <br /> <br />The previous plan had unresolved issues with roof structure and storage issues to <br />minimize stair climbing as much as possible. An elevator was explored but would be too <br />invasive from the exterior of the house as well use valuable garage space. <br /> <br />We have contacted architect, Rosemary McMonigal who has worked with enviornmentaI <br />sensitivity issues as well as arthritis. Significant changes have been made in the concepts. <br />The new footprint will pull back 2' and go less into the setback than the previous plan. <br />The preliminary sketch is ready but it is not possible to complete the final drawings and <br />specs before the variance time granted last year. These results will solve a many more <br />problems. <br /> <br />. <br /> <br />The timetable planned is attached. <br />- results for air testing - Sept. IO <br />- completion of plans and specifications -as attached <br /> <br />We request an extension for 6 months to complete this process and hope to begin <br />construction as soon as possible. Thank you for your consideration. <br /> <br />Sincerely, . ,I <br />CJ<.~/v~oda11/~ <br />CarolyrVand Carl Mohn <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.