My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-23-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 01-23-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:14 PM
Creation date
11/14/2006 4:41:45 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />d, EXPLANATION: Construction projects on the interstate highway system <br />must have federal government approvals predicated on meeting process <br />requirements, The first major step is a "Scoping Study" that includes the <br />definition and evaluation of all possible solutions to the identified <br />problems so that a fair and valid assessment of impacts can be made. <br />The proposed study will build on results of earlier Coalition work that <br />identified the 1-35WfTH 10 segment between 1-694 & 95'h Street as <br />needing significant expansion to meet current and future traffic flow <br />demands as well as ongoing development efforts by member <br />organizations. <br /> <br />Strateqy <br />Priority 1: Convince Mn/DOT to conduct the <br />resources, <br /> <br /> <br />The freeway expansion needed based on work <br />problems providing access to and from local <br />outcome of the Scoping Study will be a sh <br />competing design and access conflicts. <br />Scoping Study will cost $500,000 or . <br />needed to do the major share of t <br />internal resources available to <br /> <br />. <br /> <br />egislative process in 2006 <br /> <br />eeds of all member cities and <br />olv ts in a collaborative process, <br />iness needs for access to the regional road system <br />egree feasible, consistent with, <br />e regional system to meet regional and state <br />uses, <br /> <br />STRATEGY <br />1: Coalition Board assumes role of the Solutions Task Force <br />L Continue Technical staff work with Mn/DOT and Metropolitan <br />Council staff to identify and evaluate alternatives, <br />iL Coalition Board will assess options and recommend preferred <br />alternatives. <br /> <br />. <br /> <br />2: Foster exchange of information between development teams from individual <br />community projects. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.