My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-23-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 01-23-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:14 PM
Creation date
11/14/2006 4:41:45 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />interior coating should be spot repaired ($7,900) <br />. The existing tank vent is not a clog and/or frost resistant design as recommended by <br />A WW A standards ($7,000) <br />· Interior Coating of the bowl has areas of localized corrosion and KTA-Tator Inc. <br />recommends spot repairing of all areas of corrosion within the next three years ($13,500) <br /> <br />The Operations & Maintenance department is evaluating the inspection report recommendations <br />in order to produce a schedule for the recommended water tower work. Also, there are certain <br />items that the 0 & M department may be able to perform themselves reducing costs. <br /> <br />Also provided by KTA-Tator Inc. was an estimate for an aesthetic overcoat of the exterior of the <br />water tower if at some point the City wanted to paint the Arden Hills logo on the tank. The <br />approximate cost for that work $98,000 but is not required at this time. <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.