My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-23-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 01-23-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:14 PM
Creation date
11/14/2006 4:41:45 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PMP Memorandum <br />January 17, 2006 <br />Page 2 <br /> <br />. <br /> <br />Whether neighborhood streets meet City standards for width and curb and gutter <br />Opportunity for significant improvement of water quality of neighborhood runoff <br />Major development/redevelopment projects <br /> <br />The 5 year ClP includes projects to sealcoat approximately 20% of the city (6 road miles) every other year <br />which will result in any given street receiving a sealcoat at an interval no greater than 10 years. The 2003 <br />and 2005 sealcoat programs covered approximately 3.5 road miles (16 year cycle). <br /> <br />Since the development of the Pavement Management Program in Arden Hills, the life cycle of newly <br />constructed streets has been as follows: <br />Year 0: Full Reconstruction <br />Year 1-2: Sealcoat <br />Year 10-12: Sealcoat <br />Year 20: Mill and Overlay (top 2") and curb repair <br />Year 21-22: Sealcoat <br />Year 30: Seal coat or Mill and Overlay (top 2") and curb repair <br />Year 31-32: Sealcoat (If overlay received in year 30) <br />Year 40: Full Depth Mill, new bituminous (4"), curb repair <br /> <br />Existing streets that are candidates for overlay (streets that have curb and gutter) inserted into the City's <br />priority based primarily upon their latest PCI rating as well as the rating trend of the most recent series of <br />PCl's calculated for a given street. They are generally expected to need only sealcoats, partial mill and . <br />overlay or full depth mill and overlay along with curb repair. Some existing streets have poor subgrade <br />soils which tend to accelerate the deterioration of those streets. As funds permit in the future, these streets <br />should be considered for full reconstruction but current philosophy is to address these streets with overlay <br />treatments until they reach an age of at least 40 years. <br /> <br />C, Proposed 10 year PMP Improvements Summary <br />We have revised the proposed neighborhood pavement improvements over the next five years based upon <br />the recent Pavement Condition Ratings calculated by Goodpointe Technologies this past summer. We are <br />also projecting neighborhoods out to a period of 10 years however anticipate that some of these <br />neighborhood priorities may change as a result of future ratings and other forces and issues affecting the <br />decision to rehabilitate. Estimated project budgets have been included for the first 5 years of the ClP. <br /> <br />2006 - Reconstruction: Ridgewood Neighborhood <br />. Neighborhood process has been completed through public hearing <br />. Current PCI average ~ 40,8 (2005 rating) (excluding Ridgewood Ct.) <br />. Need for watermain and forcemain reconstruction <br />. Potential for water quality enhancement to Lake Johanna <br />. Estimated Roadway project cost: $1,114,000 <br />. Estimated Drainage/Utility project cost: $650,000 <br />. Estimated Total Project Cost: $1,764,000 <br /> <br />2007 - Mill & Overlay: Brighton Way, Arden View, Lametti & Bussard <br />. Currently lowest PCls within overlay candidates <br />. Displaces Chatham neighborhood from current plan <br />. Roadway Budgeted cost: $520,000 <br />. DrainagelUtility Budgeted cost: $165,000 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.