My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-23-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 01-23-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:14 PM
Creation date
11/14/2006 4:41:45 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />PMP Memorandum <br />January 17, 2006 <br />Page 3 <br /> <br />. Total Project Budgeted cost: $685,000 <br /> <br />2007 - Sealcoat: Red Fox, Ridgewood, Chatham Neighborhoods (inc!. Fire Station #1) <br />. Project Budgeted cost: $90,000 <br /> <br />2008 - Reconstruction: Snelling Avenue (+ Cummings Lane, North Snelling?) <br />. Snelling Ave. deteriorating rapidly <br />. North Snelling in extremely poor condition <br />. Eligible for State Aid funding to offset costs <br />. Ability to construct trail(s) along either side (not in budget) <br />. Potential for Roundabout at County Road E <br />. Current PCI = 35.8 (2005 rating) <br />. Potential for water quality enhancement to Lake Johanna <br />. Potential to realign North Snelling access to Snelling! Arden Place? <br />. Roadway Budgeted cost: $1,600,000 <br />. Drainage/Utility Budgeted cost: $345,000 <br />. Total Project Budgeted cost: $1,945,000 <br /> <br />2009 - Mill & Overlay: Wedgewood, Brueberry, Parkshore, Katie, Jamie, Karth Lake West <br />. Current Average PCl's 69-74 <br />. Anticipated Average PCI's in 2009 55-65 <br />. Project Budgeted cost: $865,000 <br /> <br />2009 - Sealcoat: Brighton Way, Lametti, Snelling, Glenhill, Colleen Ave <br />. Project Budgeted cost: $87,500 <br /> <br />2010 - Reconstruction: Glenarden Neighborhood (including North Hamline) <br />. Current Average PCI = 37.5 (2005 rating) <br />. Potential need for watermain and forcemain reconstruction <br />. Potential for water quality enhancement to Lake Johanna <br />. Last neighborhood east of Lake Johanna without C&G <br />. Roadway Budgeted cost: $1,800,000 <br />. Drainage/Utility Budgeted cost: $565,000 <br />. Total Budgeted cost: $2,365,000 <br /> <br />20 II - Mill & Overlay: Chatham Neighborhood, Connelly, Benton Way, Harriet, Pine Tree <br />. Anticipated Average PCl's in 2011 near 50-65 <br />. Current Chatham Nbhd A vc. PCI 79.8 and stable - may be dropped from list if <br />steady <br />. Harriet and Pine Tree eligible for Stale Aid <br /> <br />2011 - Sealcoat: Wcdgewood, Brueberry, Parkshore, Katie, Karth Lake West, Glenarden, <br />Glenpaul, Jerrold, Prior, Edgewater, Beckman, Sandeen, Grant, Noble, <br />Shorewood, Lake Lane <br />
The URL can be used to link to this page
Your browser does not support the video tag.