Laserfiche WebLink
<br />PMP Memorandum <br />January 1 7, 2006 <br />Page 4 <br /> <br />. <br /> <br />2012 - Reconstruction and Mill & Overlay: Floral neighborhood <br />. Current PCI average = 50 (2005 rating) <br />. Street conditions widely variable throughout neighborhood <br />. Some streets without C&G or drainage <br /> <br />2013 - Mill & Overlay: To Be Determined <br />. Based upon PCl's collected in 2008 and 2011 <br /> <br />2013 - Sealcoat: Chatham, Connelly, Benton Way, Harriet, Pine Tree, Hunters Ct, Waldon <br />Floral Neighborhood, Ingerson, Karth Lake East, Edgewater <br />Neighborhoods <br /> <br />2014 - Reconstruction: Thorn Drive + Valentine Neighborhood (M&O Janet Court) <br />. Current PCl average = 41.5 (2005 rating excluding Janet Ct) <br /> <br />2015 - Mill & Overlay: To Be Determined <br />. Based upon PCl's collected in 2008, 2011, 2014 <br /> <br />2015 - Sealcoat: 2013 M&O streets, Thom, Valentine, Red Fox, Ridgewood Nbhds <br /> <br />2016 - Reconstruction: Glenhill neighborhood <br />. Current PCI average = 62 (2005 rating) <br />. Project would be done in conjunction with Roseville <br />. Potential to enhance Lake Johanna water quality <br /> <br />. <br /> <br />Streets remaining to be reconstructed (those without curb and gutter, drainage infrastructure etc.) after <br />2016: <br /> <br />Glenpaul, Jerrold, Prior Avenue <br />Grant, Noble, Beckman, Lake Lane, <br />Gramsie, Crystal, Venus, Glenview, Rolling Hills Rd <br /> <br />. <br />