My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-21-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 02-21-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:18 PM
Creation date
11/14/2006 4:42:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />~ <br />/]'\~ HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />August 10, 2005 <br /> <br />AGENDA ITEM 2.C <br /> <br />TO: <br /> <br />Mayor and City Council <br /> <br />Michelle Wolfe, City Administrator ~ <br /> <br />SUBJECT: 2006 ., 20 I 0 CIP <br /> <br />FROM: <br /> <br />BACKGROUND <br /> <br />Staff has begun detailed review of the City's Capital Improvement Program (CIP). Due to a <br />number of considerations, the City Administrator's proposed CIP is not finalized at this time. <br />These considerations include: <br /> <br />. <br /> <br />. The PCI ratings are not yet complete and this information will be very valuable in <br />determining the priority ranking of these projects <br />. We are in the process of getting more accurate cost figures for the 2005 and 2006 PMP <br />projects as well as the lift station upgrades <br />. We have not yet completed the South Water Tower Inspection that is budgeted for this <br />year. This inspection will allow us to morc accurately budget and plan for improvements <br />necessary on this water tower. <br />. Finance staff needs some time to analyze the utility funds in light of project activity in the <br />last year as well as the proposed projects in future years. <br /> <br />Attached is a draft CIP worksheet that we are working Irom at this time. However, we anticipate <br />several changes before formally submitting this as a proposed CIP. For example, Tom Moore is <br />suggesting some changes for the timing of some of the park projects and equipment purchases. <br />Also, as noted above, there are several steps that need to be completed that will assist us with <br />putting together the proposaL <br /> <br />DISCUSSION <br /> <br />In addition to receiving some of the information olltlined above, it would also be helpful to get <br />Council direction and input on a number of items in order to proceed with the development of <br />the CIP. Some discussion points are outlined below: <br /> <br />Fund Balances <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.