Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br />/],\~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />March 6, 2006 <br /> <br />Agenda Item 6.C <br /> <br />TO: Mayor and City Council <br /> <br />FROM: James Lehnhoff, City Planner) f <br /> <br />SUBJECT: PC #: 06-007 <br />Bruce Kunkel <br />Bethel University <br />3900 Bethel Drive <br />Site Plan Review <br /> <br />Back!!round <br /> <br />Currently, there are two guard shacks for security personal at the wcstern entrance to Bethel <br />Univcrsity off of old US Highway 10. Both guard shacks are approximately 450 feet from the <br />entrance. The smaller shack, which is approximately 8'x 4', is on a median that is roughly 30 <br />feet long. The other shack is approximately 8'xI0' and is on the north side of the road. The <br />University is proposing to replace the guard shacks with a single, larger Welcome Center. The <br />new Welcome Center will be approximately 12 feet wide and 20 feet long. Thc new primary <br />median with the Welcome Center will be approximately 75 feet long and include one parking <br />space for a security vchicle. <br /> <br />A sccondary median will be added to the south of the primary median to separate a new overflow <br />traffic lane from the two regular traffic lanes for special events. The additional lane will be used <br />for special evcnts and, at some point, will be an electronic access point for students and faculty <br />to bypass the Welcome Center. <br /> <br />The applicant is also proposing to construct a retaining wall to provide additional room for the <br />sidewalk along the north side of the expanded roadway. <br /> <br />Similar to the existing guard shacks, the new Wclcome Center is still largely a security and <br />traffic control point for incoming vehicles; howcver, there will be security enhancements and <br />video monitoring within thc new structure. <br /> <br />Bethel Collcge operates undcr a Special Use Permit Master Plan. As the College comes forward <br />with expansion plans (for eithcr new or existing structures), the proposal is reviewed against the <br /> <br />\\Metro-inet.uslardenhillsIPlanning\Planning Cases\2001i101i-007 Bethel site plan review (PENDING) 1030206 - CC <br />Report ~ Bethel site plan review.doc <br /> <br />Page t of3 <br />