Laserfiche WebLink
<br />Master Plan for consistency. Building proposals that are consistent with the Master Plan require <br />only a Site Plan Review. Although the Master Plan does not call this proposed building a <br />"Welcome Center," the Master Plan does include the existing guard shacks. Since the guard . <br />shacks are essentially being replaced by a structure that is, for the most part, in the same location <br />and for the same use, it was determined by Staff that this proposal is in the spirit of thc Master <br />Plan and only requires a Site Plan Review. Nevertheless, adjacent properties were notified of <br />this proposal. <br /> <br />For additional background information, please refer to thc March 1,2006, Plaillling Case report. <br />This report is available online at <br />htto://\'-/W\v.ci.arden-hiIls.mn.us/Council and Committees/Planning CommissionJMar06 PC.htm. <br /> <br />Plannin!! Commission Rccommendation <br /> <br />At their March 1, 2006, meeting, the Plaillling Commission reviewcd Planning Case #06-007 and <br />unanimously voted to recommend approval ofthe site plan rcview based on the following <br />seven findings of fact: <br />I. The proposed Welcome Ccnter will not affect the need for parking. One parking space <br />will be added for a security vehicle at the Welcome Center. Thc Welcome Center and <br />additional traffic lane may ease congestion during high traffic events. Traffic congestion <br />is unlikely to increase with the project. <br />2. Upon completion, the project will not incrcase noise, glare, odors, vibration, smoke, dust, <br />air pollution, heat, liquid or solid waste, and other nuisance characteristics. <br />3. The project may affect drainage toward the wetlands immediately north of the project. <br />Permits may be required from the Rice Creek Watershed District. <br />4. The project will not have any affect on population density. <br />5. The project will likely increase the visual compatibility with other uses on the site. The <br />church-like architecture will be compatible with other structures at the University. Due <br />to the distance from the highway and adjacent properties, the Welcome Center is unlikcly <br />to have any significant visual impact on the highway or adjaccnt properties. <br />6. The park dedication requirement does not apply in this case. <br />7. Thc proposal meets the requirements ofthe Zoning Ordinance, does not conflict with the <br />Comprehensive Plan, and is within the spirit of the Bcthel University Mastcr Plan. <br /> <br />. <br /> <br />The Plaillling Commission recommends the following ninc conditions be included with the <br />approval: <br />1. The Applicant shall continuc to abide by the conditions of approval as stated in the <br />approved Special Use Permit (SUP) Master Plan and the subsequent SUP Amcndments. <br />2. The project shall be completed in accordance with thc plans submitted as part of the <br />Variance application. Any significant changes to these plans, as determined by the City <br />Plailllcr, shall require review and approval by the Plalming Commission. <br />3. No construction shall begin before plans are approved by the City of Arden Hills' <br />Building Official. <br />\ \Metro-inet. us lardenhillslPlanninglPlanning CasesI2006\06-007 Bethel site plan review (PENDJNG) \030206 - CC <br />Report - Bethel site plan review. doc <br /> <br />Page 2 of3 <br /> <br />. <br />