Laserfiche WebLink
<br />. C. Bridge Option C: 10.0 Foot Sidewalk <br /> <br />This option is intended to include the necessary modifications to the bridge structurc in order to <br />create a 10.0 foot widc sidcwalk without shifting thc roadway tramc, narrowing thc lanes or <br />modifying the north hridgc rail. This is accomplished through the following: <br /> <br />. Rcmoval of thc south bridge rail system. <br />. Constmction of a parallcl bcam crossing Tmnk Highway 51 including new pier and abutment <br />su pport construction. <br />. Constmction of thc south bridgc rail over the new beam support to include a 1 0.0 foot <br />sidewalk and outside ban-icr madc of concrele and fencing. <br /> <br />15' <br /> <br />Bridge Rail & walk to <br />15' be removed (both sides) <br /> <br />_i. JJ <br />-! A .A f( I <br /> <br />.-- ---- ..,-. I <br /> <br />R <br /> <br />I ' <br /> <br />/3. Elisting Cross Section of C aunrr Road E Bridge <br /> <br />. <br /> <br />Vinyl <br />~~~j~e~lnI< .1 <br />fence (7~.'~ <br /> <br />Cone. ~cuurl- <br />Type P-l <br /> <br />10' <br /> <br />I <br />i <br />I <br /> <br />15' <br /> <br />North ro.it -to reMQin <br /> <br />I <br />~i Co. Rd. E <br />r (No change) <br />, <br /> <br />15' <br /> <br /> <br />J4. Proposed Cross Section of Counry Road t.: Bridge - Option C <br /> <br />The Estimatcd Project Cost for this Option is $200,000 <br /> <br />. <br /> <br />12 <br /> <br />URS <br />