My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:24 PM
Creation date
11/15/2006 10:09:27 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />County Road E Pedestrian Improvements - Bridge Improvements <br /> <br />eption A Cost Estimate <br /> <br />ITEM <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br /> <br />Mobilization <br />Type F Railing Concrete (3Y46) <br />Type P-l Railing Concrete (3Y 46) <br />Sidewalk Concrete (3Y46) <br />Vinyl Coated Chain Link Fence <br />Expansion Jt. Device (Type 4) <br />Concrete Wearing Course (3U17A) <br />Reinforcement Bars (Epoxy Coated) <br />Traffic Control - Striping <br /> <br />Subtotal Construction <br /> <br />UNIT <br />t.S <br />LF <br />LF <br />SF <br />LF <br />LF <br />SF <br />LB <br />LS <br /> <br />QUANTITY <br />1.00 <br />154.00 <br />154.00 <br />1,155.00 <br />154.00 <br />18.00 <br />700.00 <br />500.00 <br />1.00 <br /> <br />Engineering and Construction Administration (25%) <br /> <br />Total Estimated Option A Project Cost <br /> <br />Option B Cost Estimate <br /> <br />1 <br /> <br />.~ <br /> <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br /> <br />. <br /> <br />ITEM <br /> <br />Mobilization <br />Structural Concrete (3Y36) <br />Type F Railing Concrete (3Y46) <br />Type P-1 Railing Concrete (3Y 46) <br />Sidewalk Concrete (3Y 46) <br />Vinyl Coated Chain Link Fence <br />Expansion Jt. Device (Type 4) <br />Concrete Wearing Course (3U17A) <br />Reinforcement Bars (Epoxy Coated) <br />Traffic Control - Striping <br /> <br />Subtotal Construction <br /> <br />UNIT <br />LS <br />CY <br />LF <br />LF <br />SF <br />LF <br />LF <br />SF <br />LB <br />LS <br /> <br />QUANTITY <br />1.00 <br />12.00 <br />154.00 <br />154.00 <br />1,309.00 <br />154_00 <br />20_00 <br />700.00 <br />5,000.00 <br />1.00 <br /> <br />Engineering and Construction Administration (25%) <br /> <br />Total Estimated Option B Project Cost <br /> <br />UNIT PRICE <br />$3,000.00 <br />$55.00 <br />$55.00 <br />$10.00 <br />$15.00 <br />$100.00 <br />$3.00 <br />$0.70 <br />$10,000.00 <br /> <br />TOTAL <br />$3,000.00 <br />$8,470.00 <br />$8,470.00 <br />$11,550.00 <br />$2,310.00 <br />$1,800.00 <br />$2,100.00 <br />$350.00 <br />$10,000.00 <br /> <br />$48,000.00 <br /> <br />$12,000.00 <br /> <br />$60,000.00 <br /> <br />UNIT PRICE <br />$3,500.00 <br />$500.00 <br />$55.00 <br />$55.00 <br />$10.00 <br />$15.00 <br />$100.00 <br />$3.00 <br />$0.70 <br />$15,000.00 <br /> <br />TOTAL <br />$3,500.00 <br />$6,000.00 <br />$8,470.00 <br />$8,470.00 <br />$13,090.00 <br />$2,310.00 <br />$2,000.00 <br />$2,100.00 <br />$3,500.00 <br />$15.000.00 <br /> <br />$64,000.00 <br /> <br />$16,000.00 <br />$80,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.