My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:24 PM
Creation date
11/15/2006 10:09:27 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />County Road E Pedestrian Improvements - Bridge Improvements <br /> <br />Option C Cost Estimate . <br /> ITEM UNIT QUANTITY UNIT PRICE TOTAL <br />1 Mobilization LS 1.00 $7,500.00 $7,500.00 <br />2 Structural Concrete (3Y36) CY 29.00 $500.00 $14,500.00 <br />3 Structural Concrete (3Y 43) CY 24.00 $350.00 $8,400.00 <br />4 Structural Concrete (1 A43) CY 12.00 $310.00 $3,720.00 <br />5 Type P-l Railing Concrete (3Y46) t.F 154.00 $55.00 $8,470.00 <br />6 Sidewalk Concrete (3Y46) SF 1,720.00 $10.00 $17,200.00 <br />7 Excavation LS 1.00 $7,000.00 $7,000.00 <br />8 Vinyl Coated Chain Link Fence LF 154.00 $15.00 $2,310.00 <br />9 Expansion Jt. Device (Type 4) LF 20.00 $100.00 $2,000.00 <br />10 Prestress Concrete Beam 45M LF 150.00 $130.00 $19,500.00 <br />11 Diaphram for Type 45M Prestress Beam LF 40.00 $57.00 $2,280.00 <br />12 Remove Concrete CY 38.00 $300.00 $11,400.00 <br />13 CIP Concrete Piling Delivered LF 800.00 $16.00 $12,800.00 <br />14 CIP Concrete Piling Driven LF 800.00 $2.00 $1,600.00 <br />15 Bearing Assembly EA 4.00 $500.00 $2,000.00 <br />16 Reinforcement Bars (Epoxy Coated) LB 26,000.00 $0.70 $18,200.00 <br />17 Reinforcement Bars LB 1,500.00 $0.60 $900.00 <br />18 Concrete Slope Paving SY 46.00 $11000 $5,060.00 <br />19 Traffic Control - Stripin9 LS 1.00 $15,000.00 $15,000.00 <br /> Subtotal Construction $160,000.00 <br /> Engineering and Construction Administration (25%) $40,000.0. <br /> Total Estimated Option C Project Cost $200,000.00 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.