Laserfiche WebLink
<br />9/7/2006 CITY OF ARDEN HILLS . <br /> COUNTY ROAD E PEDESTRIAN WALK <br /> PRELIMINARY CONSTRUCTION COSTS <br /> 6' Concretc Walk - South Side of County Road E <br />Item No. Item Units Quantity Unit Price Amount <br />I 6' Concrete Trail (includes base) SF 11250 $ 5.59 $ 62,900.00 <br />2 Sod LS 1 $ 5,200.00 $ 5,200.00 <br />3 Grading LF 1875 $ 3.25 $ 6,100.00 <br />4 Ped Ramp EA 4 $ 650.00 $ 2,600.00 <br />5 Striping Changes (E) LS I $ 2,600.00 $ 2,600.00 <br />6 Mobilization LS 1 $ 3,250.00 $ 3,300.00 <br />7 Concrete Curb (hand formed) LF 80 $ 32.50 $ 2,600.00 <br /> Construct Subtotal $ 85,300.00 <br /> 20% Engineering & Construction Administration $ 17,100.00 <br /> Total Sidewalk Costs $ 102,400.00 . <br />8 2' Edge Strip SF 3740 $ 10AO $ 38,900.00 <br /> 18% Engineering & Construction Administration $ 7,000.00 <br /> Total Edge Strip Costs $ 45,900.00 <br /> Total Project Costs $ 148,300.00 I <br /> <br />. <br />