Laserfiche WebLink
<br />. 9/7/2006 CITY OF ARDEN HILLS <br /> COUNTY ROAD E PEDESTRiAN WALK <br /> PRELIMINARY CONSTRUCTION COSTS <br /> 6' Concrete Walk - North side of County Road E <br /> Item No. Item Units Quantity Unit Price Amount <br /> I 6' Concrete Trail (includes base) SF 11250 $ 5.59 $ 62,900.00 <br /> 2 Sod LS 1 $ 7,800.00 $ 7,800.00 <br /> 3 Grading LF 1875 $ 4.55 $ 8,500.00 <br /> 4 Ped Ramp EA 8 $ 650.00 $ 5,20000 <br /> 5 Striping Changes (E) LS I $ 2,600.00 $ 2,600.00 <br /> 6 Mobilization LS I $ 930.37 $ 900.00 <br /> 7 Concrete Curb (hand formed) LF 160 $ 32.50 $ 5,200.00 <br /> 8 Relocate Private Utilities LS I $ 6,500.00 $ 6,500.00 <br /> 9 Culvert LF 30 $ 39.00 $ 1,200.00 <br /> 10 Retaining Wall SY 450 $ 260.00 $ 117,000.00 <br />. Construct Subtotal $ 217,800.00 <br /> 18% Engineering & Construction Administration $ 39,200.00 <br /> Total Sidewalk Costs $ 257,000.00 <br /> 8 2' Edge Strip SF 3740 $ 10AO $ 38,900.00 <br /> 18% Engineering & Construction Administration $ 7,000.00 <br /> Total Edge Strip Costs $ 45,900.00 <br /> Total Project Costs $ 302,900.00 I <br /> <br />. <br />