Laserfiche WebLink
<br />. 9/7/2006 <br /> <br />CITY OF ARDEN HILLS <br />COUNTY ROAD E PEDESTRIAN WALK <br /> <br />PRELIMINAR Y CONSTRUCTION COSTS <br /> <br /> 8' Concrete Walk - South Side of County Road E <br />Item No. Item Units Quantity Unit Priee Amount <br />I 8' Concrete Trail (includes base) SF 15000 $ 5.59 $ 83,900.00 <br />2 Sod LS I $ 5,200.00 $ 5,200.00 <br />0 Grading LF 1875 $ 4.23 $ 7,900.00 <br />-, <br />4 Ped Ramp EA 4 $ 650.00 $ 2,600.00 <br />6 Striping Changes (E) LS I $ 2,600.00 $ 2,600.00 <br />7 Mob LS I $ 5,200.00 $ 5,200.00 <br />8 Concrete Curb (hand Conned) LF 80 $ 32.50 $ 2,600.00 <br /> Construct Subtotal $ 110,000.00 <br /> 18% Engineering & Construction Administration $ 19,800.00 <br />. Total Project Cost $ 129,800.00 <br /> <br />. <br />