My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:24 PM
Creation date
11/15/2006 10:09:27 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. 9/7/2006 <br /> <br />CITY OF ARDEN HILLS <br />COUNTY ROAD E PEDESTRIAN WALK <br /> <br />PRELIMINAR Y CONSTRUCTION COSTS <br /> <br /> 8' Concrete Walk - South Side of County Road E <br />Item No. Item Units Quantity Unit Priee Amount <br />I 8' Concrete Trail (includes base) SF 15000 $ 5.59 $ 83,900.00 <br />2 Sod LS I $ 5,200.00 $ 5,200.00 <br />0 Grading LF 1875 $ 4.23 $ 7,900.00 <br />-, <br />4 Ped Ramp EA 4 $ 650.00 $ 2,600.00 <br />6 Striping Changes (E) LS I $ 2,600.00 $ 2,600.00 <br />7 Mob LS I $ 5,200.00 $ 5,200.00 <br />8 Concrete Curb (hand Conned) LF 80 $ 32.50 $ 2,600.00 <br /> Construct Subtotal $ 110,000.00 <br /> 18% Engineering & Construction Administration $ 19,800.00 <br />. Total Project Cost $ 129,800.00 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.