My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:24 PM
Creation date
11/15/2006 10:09:27 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL WORKSESSION <br />November 15,2004 <br /> <br />II <br /> <br />Councilmembcr Grant asked the City Engineer ifthis projcct would have to be resubmitted to the <br />State for approval. <br /> <br />City Engineer Brown stated that the City docs not have to resubmit the project. The State of <br />Minnesota will review the mcrits ofthc projects and thcn rank them in January of2005. <br /> <br />There was no further discussion. Mayor Applikowski asked Council to consider the information <br />presented tonight as they prepare to make a decision at the November 29'h meeting. <br /> <br />Gatewav Sil!ns <br />City Administrator Wolfe stated that at the Committee Summit on November 3,d, there was a <br />discussion regarding how to proceed with the Gateway Signs project. It was noted that the <br />Planning Commission and PTRC have discussed this issue in the past, including most recently at <br />their joint mccting in July. At the summit, it was agreed that the two committees would work <br />together and come-up with design options that would be presented to the City Council. One of <br />the gatcway sign options should include the excess stone that was purchased when City Hall was <br />built. This group is also being asked to come up with a recommended plan for sign purchase and <br />implementation. <br /> <br />Mayor Aplikowski believes that the City Council should hand pick a sub-committee of the two <br />groups to explore the gateway sign project. <br /> <br />Community Development Director Clark suggested that the Planning and PTRC Committees <br />have a meeting to discuss four different gateway sign options. Each gateway sign will have to be <br />developcd based upon the land topography. <br /> <br />City Administrator Wolfe stated that City staff will come back with the gateway sign parametcrs <br />to the City Council in January 2005. <br /> <br />Council Reports <br />Councilmember Lois Rem: <br />Councilmember Rem infonned staff members that she received a call trom a resident rcgarding a <br />possible chcmical spill behind Valentine Hills Elementary School. The emergency contact list <br />was very useful. She recommended that the emergency contact list bc inscrtcd in the utility bills <br />for all Arden Bills residents. <br /> <br />Councilmernbcr Rem reported that the No Lcft Turn sign and stop sign have been vandalized <br />numerous times on Lake Valentine Road. Should the City contact Mounds View High School <br />and the Sheriffs Department when thc new signs are installed? <br /> <br />Operations and Maintenance Director Tom Moore stated that he would contact Mounds View <br />High School and the Sheriffs Department when the new signs are installed to monitor the <br />situation. <br /> <br />CounciJrnember Brenda Holden: <br />Councilmcmber Holden asked about thc stalus of the building inspector position? <br />
The URL can be used to link to this page
Your browser does not support the video tag.