My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:24 PM
Creation date
11/15/2006 10:09:27 AM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS PLANNING COMMISSION -SEPTEMBER 6, 2006 <br /> <br />5 <br /> <br />Chair Sand closed the puhlic hearing at 7:48 p.m. <br /> <br />Commissioner McClung asked if the County was comfortable with two driveways onto <br />Lake Johanna Boulevard. Mr. Lehnhoff responded the County did request the two <br />driveways. <br /> <br />Chair Sand askcd how far down or up Siems Court did this stormwater improvement <br />work extcnd. Ms. Giga responded lOO or 200 feet north of Arden Place, which was <br />approximately what flowed there right now. <br /> <br />Chair Sand asked if the driveway cuts had been designated at this time. Ms. Giga <br />responded the driveway cuts would be put in when the property was developed. Mr. <br />Lchnhoff stated that Ramsey County would dctcrmine the location of the driveways. <br /> <br />Commissioner McClung asked if they wanted this to meet the NERP standard, how much <br />more squarc footage would be required. Ms. Giga responded she did not have that <br />information and she would need to chcck with URS. <br /> <br />Commissioncr McClung stated he would support this because he believed this was in the <br />best interest of the City and the neighborhood. Hc bclieved thc City Engineer had taken a <br />lot of time to ensure this would work. He statcd this was an improvcment for this area. <br /> <br />Mr. Lehnhoffrequested a Condition l7 to state: The applicant shall provide soil borings <br />or other proof that the building pads arc buildable prior to filing the final plat and subject <br />to City Engineer review. <br /> <br />Commissioner Larson moved, seconded by Commissioner Zimmerman to approvc <br />Planning Case No. 06-026, Preliminary Plat, Arlene Boutin, 1600 Lakc Johanna <br />Boulevard, subject to the sixteen conditions as noted in staffs August 30, 2006 report <br />and condition 17 as added by staff. <br /> <br />The motion carried unanimously (5-0). <br /> <br /><<~ <br />~ <br />Q~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.