Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />2. t.6 .Ibe ENGINEER shalt conduct and prepare preliminary studies, layouts, sketches, preliminary <br />field work, preliminary cost estimates, estimates of assessment rates, and shall assist the CITY in obtaining required <br />subsurface investigations as required for the preparation of Feasibility Reports. Feasibility Reports shall conform to <br />the fonnat presented in Exhibit B of this Agreement, "Feasibility Report Fonnat". The report shalt contain <br />schematic layouts, sketches and conceptual design criteria with appropriate exhibits to indicate clearly the <br />considerations involved (including appticabie requirements of governmental authorities having jurisdiction as <br />aforesaid) and the alternative solutions available to CITY and selling forth ENGINEER's rmdings and <br />recommendations. The Feasibility Report shalt include a project schedule .nd shalt identifY the benefiting .rea(s) <br />andJor owners. The Feasibility Report wilt be accompanied by ENGINEER's opinion of probable costs for the <br />Project, including the following which will be separately itemized: construction cost and indirect cost consisting of <br />engineering costs and contingencies, and (on the basis of infonnation furnished by CITY) allowances for such other <br />items as charges of all other professionals and consultants, for the costs ofIand and rights-of-way, for compensation <br />for or damages to properties, for interest and financing charges and for other services to be provided by others for <br />CITY pursuant to paragraphs 4.7 through 4.1 t, inclusive. 'Ibe total of all construction and indirect costs are <br />hereinafter called "Total Project Costs". <br /> <br />2.1.7 Furnish a draft of the Study and Report documents and review them in person with the ClTY. <br /> <br />2.1.8 Revise the Report in response to CtTY's comments, as appropriate, and furnish final copies oflhe <br />Report in the number set forth in any Work Order and within the time frame set forth in the Work Order. <br /> <br />2. t.9 ENGINEER shall assist with presenting the Feasibility Report to the proper reviewing agencies <br />and to the City Council. The ENGINEER shall appear at the public hearing to present the inronnation. <br /> <br />The duties and responsibilities of ENGINEER during the Study and Report Phase as set forth in this paragraph 2. I <br />are amended and supplemented as indicated in any Work Order. <br /> <br />2.2.. PRELIMINARY DESIGN PHASE <br /> <br />After receipt of an executed Work Order for such services, ENGINEER shall: <br /> <br />2.2.1 ]n consultation with CITY and on the basis of the accepted Study and Report documents, <br />determine the general scope, extent and character of the Project; attend necessary conferences and be available for <br />general consultation. <br /> <br />2.2.2 Prepare Preliminary Design doclUnents consisting offmal design criteria, preliminary drawings, <br />outline specifications and written descriptions of the Project. <br /> <br />2.2.3 Advise ClTY if additional data or services of the types described in paragraph 4.9 are necessary <br />and assist CITY in obtaining such data and services. <br /> <br />2.2.4 Based on the infoIDlation contained in the Preliminary Design documents, submit a revised <br />opinion of probable Total Project Cost. <br /> <br />2.2.5 Furnish copies of the Preliminary Design documents in the number established in the Work Order <br />and present and review them in person with CITY. <br /> <br />2.3 - FINAL DESIGN PHASE <br /> <br />After authorization to proceed with the Final Design Phase, ENGINEER shall, ifset forth in a Work Order: <br /> <br />2.3.1 On the basis of the accepted Preliminary Design documents and the revised opinion of probable <br />Total Project Costs prepare for incorporation in the Bidding Documents final drawings (herein called "Drawings") to <br />show the general scope, extent and character of the work to be furnished and performed by the contractor (herein <br />catted "Contractor(s)") and Specifications. <br /> <br />ARDEN.WPD <br /> <br />Rev. December 12, 1997 <br /> <br />2 <br />