<br />. <br /> <br />. <br /> <br />. <br /> <br />4.15 Furnish, or direct ENGINEER to provide, Additionat Services as stipulated in paragraph 2.1 of this <br />Agreement or other services as required. <br /> <br />4.16 Bear all costs incident to compliance with the requirements of this Section 4, <br /> <br />SECTION 5 - PERIODS OF SERVICES <br /> <br />The provisions of this Section 5 and the various rates of compensation for ENGINEER's services provided for <br />elsewhere in this Agreement have been agreed to in anticipation of the orderly and continuous progress of the <br />Project through completion ofthe Construction Phase. ENGINEER's obligation to render services hereunder will <br />extend for a period which may reasonably be required for the design, award of contracts, construction and initial <br />operation of the Project including extra work and required extensions thereto. <br /> <br />5. I The services called for in the Study and Report Phase will be completed and the Report submitted <br />with the agreed period after written authorization to proceed with that phase of services is given by CITY. <br /> <br />5.2 After acceptance by ClTY of the Study and Report Phase documents indicating any specific <br />modifications or changes in the general scope, extent or character of the Project desired by CITY, and upon \Witten <br />authorization from CITY, ENGINEER shall proceed with the performance of the services called for in the <br />Preliminary Design Phase, and shall submit preliminary design documents and a revised opinion of probable Total <br />Project Costs within the agreed period. <br /> <br />5.3 Aller acceptance by CITY of the Preliminary Design Phase documents and revised opinion of <br />probahle Total Project Cost, indicating any specific modifications or changes in the general scope, extent or <br />character ofthe Project desired by CITY, and upon written authorization by CITY, ENGINEER shall proceed with <br />the performance of the services called for in the Final Design Phase; and shall deliver Contract Documents and a <br />revised opinion of Total Project Cost for all work ofContractor(s) on the Project within the agreed period. <br /> <br />5.4 ENGINEER's Basic Services for each phase, shall each be considered complete at the earlier of <br />(I) the date when the submissions for that phase havc bccn acccpted by CITY, or (2) thirty (30) days after the date <br />when such submissions arc delivered to CITY for final acceptance, plus in each case such additional time as may be <br />considered reasonable for obtaining approval of governmental authorities having jurisdiction to approve the design <br />of the Project. <br /> <br />5.5 After acceptance by ClTY of ENGINEER's Drawings, Specifications and other Final Design <br />phase documentation including the most recent opinion of probable Total Project Cost and upon written <br />authorization to proceed, ENGINEER shall proceed with performance of the services called for in the Bidding or <br />Negotiating Phase. This Phase shall terminate and service to be rendered thereunder shatt be considered complete <br />upon commencement of the Construction Phase or upon cessation of negotiations with prospective Contractor(s). <br /> <br />5.6 Ifauthorized by Work Order, the Construction Phase will commence with the execution of the fIrst <br />prime contract to be execuled for the work of the Project or any part thereof, and will terminate upon written <br />recommendation by ENGINEER of final pa:yrnent on the last prime contract to be completed. Construction Phase <br />services may be rendered at different times i~ respect of separate prime contracts if the Project involves more than <br />one prime contract. <br /> <br />5.7 If authorized by Work Order, the Operational Phase will commence during the Construction Phase <br />and will terminate one year after the date of Substantial Completion, as defined in the Contract Documents, if the <br />last prime contract for construction, materials and equipment on which substantial completion is achieved. <br /> <br />5.8 lfClTY has request for significant modifications or changes in the general scope, extent or <br />character of the Project, the time of performance ofENGTNEER's services shall be adjusted accordingly. <br /> <br />5.9 CITY shall give prompt authorization to proceed or not proceed with any phase of services after <br />completion of the immediately preceding phase. <br /> <br />ARDEN. WPD <br /> <br />12 <br /> <br />Rev. December 12, 1997 <br />