Laserfiche WebLink
<br />I <br /> <br />Schedule C - Watermain <br />The watennain scope is proposed to be reduced by limiting replacement of hydrants and valves to only those which are <br />.cated along the new watennain to be constructed along Arden Place. The proposed modifications are outlined below: <br /> <br />I. Rcducc Remove Gate Valve and Box (6"-8") by 3 @ SS20.00/Ea ~ ($1,560.00) <br />2. Reduce Remove Hydrant and Valve by 7 @ $780,00/Ea = ($5.460.00) <br />3. Reduce F&I Hydrant and Gate Valve by 7 @ S3,S20/Ea ~ (S24,640,00) <br />4. Reduce 6" Gate Valve and Box by 3 @ $1,1 OO.OO/Ea = ($3,300.00) <br />S. Reduce 8" Gatc Valvc and Box by 2 @ S1,660.00/Ea ~ ($3,320,00) <br />6. Reduce 6" Watermain DIP CL 52 by 150 LF @ S37.40/LF = ($5,610,00) <br />7. Reduce 8" Watermain DIP CL 52 by 200 LF@S41.20/LF= ($8,240,00) <br />8. Reduce Hydrant Extensions by 6 LF @ SS64.00/LF = ($3,384,00) <br />9. Reduce Gate Valve Extensions by 10 LF @ $190.00/LF = ($1,900,00) <br />10. Reduce Watemlain Fittings by 448 Lb@ S8.00/Lb ~ ($3.584.00J <br />Subtotal Schedule C - Watermain ($60,998.00) <br /> <br />CHANGE ORDER SUMMARY <br /> <br />Schedule A - Roadway <br />Schedule B - Storm Drainage <br />ehedule C - Watermain <br /> <br />Total Contract Modification for Change Order No.1 <br /> <br />($12,269.40) <br />($45,422.76) <br />IS60.998.00) <br /> <br />(S118,690.16) <br /> <br />End of Change Order No.1 <br /> <br />. <br />