<br />\ <br /> <br />Attachment to Change Order No.1 <br /> <br />. <br /> <br />Owner: <br />Contractor: <br />Project: <br /> <br />City of Ardcn Hills <br />Amt Constrnction Company, Inc. <br />2006 Pavement Management Program <br /> <br />Description of changes: <br />Several modifications are proposed to the project plans in ordcr to bring project costs closer to available funding, The <br />modifications are included with the Roadway, Storm Drainage and Watermain portions of the project. As a result ofthcsc <br />modifications, the scope of the project will decrease, as well as the contract amount for the project. The following is an <br />overview of the modifications proposed to the contract: <br /> <br />Schedule A - Roadway <br />The common excavation quantity included with the bid is based upon a roadway cross section which includes 8" of <br />aggregate base and 4" of bituminous. The final design was modified to include 6" of aggregate base and 3,5" of <br />bituminous. The common excavation quantity shall be reduced to reflect the thinner pavement section as follows: <br /> <br />I, Reduce common excavation by 910 CY @ $12.34 ICY = <br />2. Reduce Bulkhead Pipe by 2 Ea @ $S20.00/Ea = <br />Subtotal Schedule A - Roadway <br /> <br />($11,22940) <br />($1.040,00) <br />($12,269.40) <br /> <br />. <br /> <br />Schedule B - Storm Drainage <br />The storm sewer scope is proposed to be reduced by utihzing an existing outlet to Lake Johanna thereby eliminating the <br />new outlet included witli the bid, In addition several miscellaneous modifications to the storm sewer pipe alignments and <br />sizes are proposed throughout the neighborhood to reducc costs, Thc proposed changes will not adversely effect the <br />effluent watcr quality for system discharges into Lake Johanna. The proposed modificatIOns include pipc and grading <br />changes requested by thc DNR and Rice Creek Watershed District as a part of permit approvals, The proposed <br />modifications are outlined below: <br /> <br />I, Increase Common Channel Excavation by 578 CY @ $14.S8/CY = $8,427.24 <br />2, Reduce 29"XI8" RC Pipe Apron by 3 Ea @ $I,460.00/Ea = ($4,380.00) <br />3. Reduce 29" X18" Trash Guard by 2 Ea@ $S06,00/Ea = (SI,012,OO) <br />4. Reduce 12" RC Pipe by 200 LF @ $34,00/LF = (S6,800,00) <br />5, Reduce 29"X 18" RC Arch pipc by III LF@ $78.00/LF = (58,658,00) <br />6. Reduce 18" HDPE Pipc Sewer (Bored) by 230 LF @ $IS4,00/LF =($35,420.00) <br />7. Increase 30" RC Pipe by 128 LF @ $63,00/LF = $8,064.00 <br />8, Reduce 48" Drainage Structure by 10 LF @ 5250.00/LF = ($2,500.00) <br />9. Reduce Floating Silt Curlain by 100 LF@$12.00/LF= ($1,200,00) <br />10. Reduce Limestone Rock Wall by 81 SF @ $24.00/SF = ($1.944,00) <br />Subtotal Schedule B - Storm Drainage ($45,422.76) <br /> <br />. <br />