My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-19-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 06-19-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:37 PM
Creation date
11/15/2006 10:10:26 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Warming House Status Memo <br />June 14,2006 <br />Page 2 on <br /> <br />. The total estimated cost when adding this option to the repairs for each building is: <br /> <br />. <br /> <br />. <br /> <br />Hazelnut Park: <br /> <br />Choice I: $1,691 proposed repairs (original report) plus $571.60 ~ $2,262.60 <br />Choice II: $1,691 proposed repairs (original report) plus $469.60 = $2,160.60 <br /> <br />Freeway Park: <br /> <br />Choice I: $1,103 proposed repairs (original report) plus $571.60 ~ $1,674.60 <br />Choice II: $1,103 proposed repairs (original report) plus $469.60 ~ $1,572.60 <br /> <br />2) OPTION D (ALTERNATIVE): Bring in Home Depot to construct a TUFF shed. <br /> <br />· These sheds can be ordered in various sizcs and the total cost includes delivery and <br />construction. <br /> <br />· Home Depot can deliver and construct these buildings in less than a day. <br /> <br />· These buildings do have extra options available. <br /> <br />· Photos, sizc options, and additional options are included (attachment 2A-2). <br /> <br />· Staff would have to make adjustments to the construction. (To name a few: A ceiling <br />would need to be installed, insulation added throughout the building, interior paneling <br />added, electrical installed, a heater would need to be added and hooked up) <br /> <br />The total estimated cost for this alternative would depend on the type of TUFF shed and <br />size desired. Please refer to attachment 2A-2. The construction adjustments and added <br />costs would have to be determined after the specific building type and size are chosen. <br /> <br />3) OPTION E: Move existing warming house buildings (20 x 28 ft.) from Cummings Park <br />and Valentine Park to Freeway Park and Hazelnut Park <br /> <br />· Buildings are currently in good shape. Cummings would need to have work done on the <br />roof. <br /> <br />· Buildings would have to be repaintcd or resided. <br /> <br />· Semple Movcrs gave staff a cost estimatc of $4,000 per building to move to the two <br />diffcrent sites. A concrete slab (20 x 28 ft.) would have to be put in at each site. If the 0 <br />& M Department does the work, it would cost approximately $2,496, including labor. <br /> <br />The total estimated cost estimate for this option would be a minimum $6,496 per site. The <br />estimated cost does not figure in existing building tear down (20.4 x 14.6 building size), post <br />removal and restoration, gate removal and restoration, necessary tree trimming, or <br />electrical hook-up. <br />
The URL can be used to link to this page
Your browser does not support the video tag.