My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-19-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 06-19-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:37 PM
Creation date
11/15/2006 10:10:26 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Warming House Status Memo <br />May 3,2006 <br />Page 3 of6 <br /> <br />. Electrical Relocation: A one time fee of $3,825 for Freeway Park and a one timc <br />fce of$l ,600 for Hazelnut Park (Attachment 7B-6) <br /> <br />. Tear Down: $285 plus labor for a 20-yard dumpster <br /> <br />. Rental of a mobile unit: $379.70 per month (approx. $],139,] 0 pcr season) <br /> <br />. Delivery/set up fee: $210 per season <br /> <br />The estimated annual eost for this option would be $1,349.10 per site plus the <br />one time cost of electrical relocation of $3,825 for Freeway Park and $1,600 for <br />Hazelnut Park. \Ve would ineur a $285 fee per site for a 20 yard dumpster for <br />tear down. Tear down figures do not include labor. <br /> <br />for a specitlc breakdown of cstimated costs lor this option, please refer to the <br />attached estimates, (Attachment 7B- 7) <br /> <br />. <br /> <br />(3) OPTION C: Build a small portah]e building that can be stored olf site during the off <br />season and brought in during the link season, <br /> <br />This has bcen done for the City of St Michael. The building was built in ] 999 at a <br />cost 0[$5,000. Mr. Ed Haller, Pubic Works Superintendent for St Michael, referred <br />to the huilding as an "oversized ice fishing house," Pictures o[ this option arc <br />attached. (Attachrncnt 7B-8) The building specillcations is below: <br /> <br />. 16 loot wide by 20 foot long, vinyl on the outside and plywood on the inside. It . <br />has one door and two windows. <br /> <br />. St. Michael Puh]ic Works has a certified carpenter on staff that was responsible <br />for this project It was constructed during the winter months. <br /> <br />. It has skids, in place of wheels bccause it can hc dragged to the winter location, <br />approximately 500 teet <br /> <br />. It is only used during ice skating season. <br /> <br />. It has a hcater and one toilet stool. They pay BIFFS, Ine. to hook up a waste <br />water tank, similar to what cxists in an outdoor toilet <br /> <br />. If they had to build it again, they would make it longer and use wheels instead of <br />the skids. <br /> <br />The total estimated overall cost for this option is $8,825 for Freeway Pa,.k and <br />$6,600 at Hazelnut Park, which includes a one time building cost of $5,000 per <br />site plus a one time cost of $3,825 for electrical relocation at Freeway Park and <br />$1,600 at Hazelnut Park. 'Ve would incur a $285 one time fee per site for a 20 <br />yard dumpster for tear down. These figures do not factor in building or tear <br />down labor costs. <br /> <br />One qucst;on that has comc up with this option is: Where do we store the buildings" <br />Currently, there 15 no space at the Ramsey County/Arden llills Maintenance Facility <br />10 accommodate tbe buildings, . <br />
The URL can be used to link to this page
Your browser does not support the video tag.