My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-19-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 06-19-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:37 PM
Creation date
11/15/2006 10:10:26 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />~ <br />EN HILLS <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />May 3, 2006 <br /> <br />TO: <br /> <br />Michelle Olson, Rccrcation Program Supervisor <br /> <br />FROM: <br /> <br />Kristine Giga, Civil Engincer <br /> <br />SUBJECT: <br /> <br />Valentine Park <br /> <br />Per your request, I have reviewed the existing conditions at Valentinc Park. The park currently <br />expcricnces drainage problems due to the minimal difference in elevation between the park and <br />the ordinary water level of Lake Valentine. <br /> <br />The Local Stormwater Management Plan preparcd by SEH in 200] identifies Valentine Park as <br />the location of a regional pond. The proposed rcgional pond would serve a drainage area of 58 <br />acres. Thc proposed size of the pond, as rcported in the management plan, is 2A6 acres in <br />surface arca, or approximately 85% of thc area of the park, <br /> <br />The Parks, Trails and Open Space Plan prepared by the PTRC in 2002 proposed improvemcnts <br />to Valentine Park. The proposal includes two ponding arcas, storm sewer and overall drainage <br />improvements, replacement of park and play structures, the parking lot and the construction of a <br />new trail. Estimated costs wcre listed at $]40,000 lor these improvements, <br /> <br />Due to an increase in construction costs over the last 5 years, a revised estimate should be used <br />for planning and budgeting purposcs. An estimated cost for pond construction, drainage <br />improvements (regrading the park), basic landscaping, and parking lot, trail and half-court <br />basketball construction is about $220,000, including estimated engineermg fees. This cost is <br />preliminary and does not include park structurc improvements. <br /> <br />A study of the entire drainagc arca is recommend cd prior to improvements at thc park, This <br />would assist in preventing adjaccnt prope11ies and thc neighborhood overall from cxperiencing <br />drainage problems as a result of changes made to the park. <br /> <br />C\DOCllmenls and SCl1iJlgs\rnicl1ellc.olson\Local SCllings\lernporary Interne! Fiks\OLK4J\5-]-06 Memo Valen1ine PmK_doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.