My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-25-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-25-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:45 PM
Creation date
11/15/2006 10:10:59 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Contract Contract To Date <br />10, MnDOT No. Item Description Unit Unit Price Quantity Amount Quantity To Dale Amount <br />14.04602 RECONNECT WATER SERVICF EA $575.00 1400 $8,05000 11.00 $6.325.00 <br />15 2504,602 I' CURB STOP ANDflDX EA $350.00 1400 $4,900.00 1,00 $700.00 <br />'6 2504 602 1" COPPORATION STOP EA $24800 "00 $3,47200 11,00 $2,72600 <br />'1 2504.603 I" TYPE K COPPER PIPE (DIRECT IONAl BORED) LF $2300 77000 $17,71000 1~.400 $3,542.00 <br /> 2504,603 HYDRANT EXTENSIOr<S LF $564.00 12.00 $6,76800 000 $0.00 <br />9 2r,04 603 GAI~ VALVE BOX EXTENSIONS LF $WOOO '600 $3,040.00 000 $0,00 <br />'0 250460i1 2'PQLYSTYRENE INSULATIO!--J SY $24,00 36.00 $864.00 0.00 $0,00 <br />'1 2504 608 WAT~HMAIN FmlNGS LB $800 94800 $7,584.00 1,066.00 $8,528,00 <br /> Schedule C - Waermain Sub10tal $240,016.00 $153,844.80 <br /> <br />::;HEDULE 0 - SANITARY SEWER <br /> <br />2021501 <br /> <br />MOBILIZATION <br /> <br />LS $30,000.00 006 $1,80000 006 $1.800,00 <br />LF $3940 40,00 $1.57600 000 $000 <br />LF $2680 2,02500 $54.270J)0 1,900,00 $50,920.00 <br />EA $6.014.00 200 $12,028.00 200 $12,028.00 <br /> S<:hedule D . Sanitary Sewer Sublotal $69,674.00 $64,748.00 <br /> <br />2503603 <br /> <br />4'PVC SANITARY SEfiVICE <br /> <br />2503.603 <br /> <br />6' HOPE SANITARY FORCEMAIN (DIRECTIONAL AOR~OI <br /> <br />'.= <br /> <br />CONNECT TO EXISTING SANIl ARY SEWER MANHOLE AND FORCEMAIN <br /> <br />ORlGINALCONTAACT AMOUNT SUBTOTALS <br /> <br />$l.11lli1.SB4.3~ <br /> <br />S%7,8l>7.a8 <br /> <br />SCHEDULE E - CHANGE ORDER NO.1 <br /> <br />IANGE ORDER NO.1. ROADWAY <br /> <br />COMMON EXCAVATION <br /> <br />Cy <br /> <br />$1234 <br /> <br />(91000) <br /> <br />($11,22940) <br /> <br />000 <br /> <br />$0.00 <br /> <br />BLJLKHfAOPIPE <br /> <br />EA <br /> <br />$520.00 <br /> <br />(2.00} <br /> <br />[$1,040(0) <br /> <br />000 <br /> <br />$0.00 <br /> <br />Schedule E - Change Order NO.1 Roadway Subtotal <br /> <br />($12,269.40) <br /> <br />$0,00 <br /> <br />. <br /> <br />BollO <br />
The URL can be used to link to this page
Your browser does not support the video tag.