My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-25-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 09-25-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:21:45 PM
Creation date
11/15/2006 10:10:59 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Contracl Contract To Date <br />No. MnDOT No. Item Description Unit Unit Price Quantity Amount Quantity To Date Amount <br />:;HANGE ORDER NO.1. STORM DFlAINAGE . <br /> COMMON CHANNEL EXCAVATION CY $1458 578,00 $8,42724 000 $0,00 <br />2 29"XI6'RCPIPEAPRON EA $1,45000 (300) ($4.3110QO) 000 $000 <br />3 29"X1S'TRASHGUAAD FA $506.00 (2.00) ($1,01200) 000 50.00 <br />, lz"nCPIP[ Lr $2400 (200.00) ($6.600.00) 000 $0,00 <br /> 2,""X18"RCARCHPIPE LF $78,00 (111.001 ($8,65800) 0.00 $0.00 <br />2 lWHDPEPIPESEWEf1 LF $t54.oo (230.00) ($35.42000) 0,00 $0.00 <br />3 3(l' RC PIPE LF $6-.100 12800 $8,064.00 0,00 $0,00 <br />, 48" DRAIN/,GE STRUCTURE LF $250.00 (1000) ($2,500.00) 000 $0.00 <br /> FLQATlNGSILl CURTAIN LF $12.00 (100.00) ($1,200(0) 000 $0.00 <br />2 LIMESTONE ROCK WAil SF $2400 (81 (0) ($1,9M,oo) 000 $000 <br /> Schedule E - Change Order No. 1 Storm O1"ainage Subtotal {$4S,422.76) $0.00 <br /> <br />HANGE ORDER NO.1 - WATERMAlN <br /> <br />2 <br /> <br />REMOVE GATE VAlVlc AND BOX EA $520.00 (3.00) {$1,560.00) 000 <br />REMOVE HYDRANl AND VAlVE EA $780,00 (7.00) f$5,460.00) 000 <br />FKIHYORANT AND GATE VALVE EA $3,520,00 (7.00) ($24,640.00) 000 <br />t;"(;AWVAlVE AND BOX EA $1,100,00 {3.00) i$3,3oo.00) 000 <br />WGA1EVALVEANDflOX EA $1,136000 (200) ($3-.32000) 000 <br />6"WATEI1MAIN DIP Cl 52 LF $3740 (150.00) {$5.61000} 000 <br />S'WATERMAlN DIP Cl&2 LF $41.20 (20000i ($8.24000) 0.00 <br />HYDf!ANTEXTENSIONS LF $564.00 {ROO} ($3.384,00) 000 <br />GATE VALVE EXTENSIONS LF $19{].00 (1000) ($'1.90000) 000 <br />WATERMAIN FITTINGS lB $8.00 (448.00) ($3,584.00) 000 <br /> <br />3 <br /> <br />4 <br /> <br />2 <br /> <br />3 <br /> <br />, <br /> <br />2 <br /> <br />$0.00 . <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$000 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br /> <br />Schedule E - Change Order NO.1 Watermair\ Subtotal <br /> <br />($60,998.00) <br /> <br />SCHEDULE F - CHANGE ORDER NO.2 - WATERMAIN <br /> <br />TEMPORARY WATER SYSTEM <br /> <br />LS <br /> <br />$13.420.00 <br /> <br />$13.420,00 <br /> <br />100 <br /> <br />0.00 <br /> <br />$0.00 <br /> <br />SChedule F " Change Order NO.2 - Watermalo Subt(>~l <br /> <br />$13,420_00 <br /> <br />CHANGE ORDER SUBTOTALS <br /> <br />1$\0~':>70.H;) <br /> <br />GRAND TOTAL $1,703,314.16 <br /> <br />90110 <br /> <br />$0.00 <br /> <br />$0.00 <br /> <br />. <br /> <br />$967,887.88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.