Laserfiche WebLink
� <br />� <br />a <br />22 <br />although we would have no immedia�e service I think it is <br />important enough to the property and speaking purely from a <br />selfish viewpoint Z feel it is an asset to the property and good <br />for Arden ffills also. Thank you. <br />t�RS. STEPEIPN PRAGER, 332G North Bunlap: First of all, <br />can you tell me how many companies are asked to bid on the project? <br />NR. GUILLIAM BHNISTER, Banist�r Engineering Company: This is <br />� <br />advertised by law in the Construction Bulletin, which is a trade jour- <br />nal, and, of coursa� �ere is no guarantee as to how many will bid <br />but generally speak�ng we can average it out,that there would be <br />10 or 12 bidders which submit bids on the construction of the <br />project. That will vary. Sometimes it's as low as 7 and sotn�times <br />as high as 20. <br />NF�S. PRAGER: Could you tell what this main lift station is <br />yoing to look like? <br />hR. SHORT: I would say at this time and would recot►enend at <br />this time that the structure should be constructed of concrete <br />below ground level and should be a brick veneer building above <br />gradQ; attractive building with a flush roof, projected overhang; <br />be landscaped and shou�d be an at¢sactive building.. <br />MAYOR ASHBACH: How large would thai be? <br />M�Ft. SHGRT: I would say about 12 by 12 or 12 by 16. <br />hR. ED HUSTAD, 1445 Forest Lane: I am for the project, and on <br />the last page of the brochure that we all got in the mail - under <br />paragsaph 4 in the ccnclusion, "the cost is reasonable and compares <br />favorably with other metropolitan suburbs". I'd like a few brief <br />remarks on what the experience has bean in other suburbs in Ramsey <br />County in the last four years or so. <br />