Laserfiche WebLink
BANISTER ENC3INEERING CO. <br />CONSULTING ENGINEERS <br />910 NORiX HNELLINO AVENUE <br />ST. PAUL 4, MINN. <br />� <br />PXON6r MIOWAY 84B1i <br />Viilage Council <br />Village of Arden Hills <br />1450 Sdest Highway 96 <br />St. Paul 12, Minnesota <br />Gentlemen: <br />September 12, 1960 <br />In accordance with previous conversations with your Council, we are pleased to submit <br />this Proposal for Engineering Services for the preparation of a complete investigation, <br />study, and comprehensive report for a Village Waterworks System. <br />A. STUDIES AND REPORT <br />1. We propose to make a complete study of the eatire area within the limits of <br />your Village based upon existing maps and data available and supplemented by <br />field surveys to be made by us for the purpose of determining the portions <br />oi your Village which may require water service bothi.in the near future and <br />in the more distant but foreseeable future. <br />� <br />2. We caill include a study of the topography, present development, land use, <br />and zoning together with present and proposed street locations to determine <br />the proper location of water mains, we11s, and storage reservoirs of the <br />system, taking into account near and distant future requirements. <br />3. We will make a study of the possibility of developing an independent Village <br />water supply utilizing deep wells in comparison with making a connection with <br />the City of St. Pau1, the Village of New Brighton, the Viliage of Roseville, <br />or the Twin Cities Arsenal, and distributing purchased water to the Village <br />users. The study would be made on an economic basis considering both initial <br />cost and over-a11 long range cost , taking into account the possible need <br />for treatment of well water. <br />4. We will study the u�atter of storage in combination with supply to determine <br />the most economical and practical ratio of each for both domestic and indus- <br />trial nse and with further consideration of fire flow requirements. <br />• <br />5. We will prepare a report and master plan for a waterworks system for the <br />entire area of your Village. This would inciude a discussion of the various <br />problems involved and would establish a program of water mains for both near <br />and distant future requirements, together with a map cahich would be a part <br />of the master plan upon which adequate information would be shown cahich, whea <br />combined with writCen discussions, would present a complete preliminary report. <br />There would be included complete estimates of cost for all portions and phases <br />of the system based on current prices together with a comprehensive written <br />over-all report for the development of a complete water system providing for � <br />a program to meet the requirements as they develop such that a11 units will <br />integrate into a complete system. <br />