Laserfiche WebLink
, <br />� <br />Page 2 of Proposal <br />Arden Hills Village Council <br />September 12, 1960 <br />For the foregoing work we are to be paid on a per diem basis as hereinafter outlined. <br />It is specifically understood and agreed that the total cost of this service sha11 not <br />exceed the sum of $10,000.00. <br />B. FUTURE WORK <br />In the event the Village Council elects to proceed further with the work and directs <br />us to prepare detailed plans and specifications for a portion or all of the work <br />covered by the aforesaid report, we will prepare such plans and specifications in <br />accordance with the fees recommended by the Minnesota Society of Professional <br />Engineers, which are those fees you paid for plans and specifications for your <br />sanitary sewer construction under Improvements No. 1, 2, 3 and 4. <br />We further propose that all monies paid for the studies and report as referred to <br />herein shall apply as fu11 credit against those fees. <br />C, SPECSAL PROVISIONS <br />It is to be specificaYly understood and agreed that by acceptance of this Proposal, <br />the Village is not obligated to us in any way unless and until the Village receives <br />a Federal Couununity Facilities Administration Planning Advance, and it is to be <br />further understood that all costs for this preliminary study and report shall be <br />made from aforesaid Planning Advance. <br />� The Village agrees to make available to and furnish us with all the existing and <br />pertinent information in the way of maps, records, plans, contours, profile, <br />stndies, etc. which are available in respect to all phases of the work to be <br />undertaken. <br />We are to aCtend any and all conferences deemed desirable and proper regarding <br />this matter with the Village officials and with State and other officials, when <br />authorized by the Village. <br />It is to be specifically understood that <br />this Ptoposal do not include the cost of <br />exploration caork. <br />• <br />D. PER DIEM FEES <br />the engineering services provided for in <br />drilling test o�ells or any anderground <br />We propose to keep complete time records for all work performed on this project <br />and charges to the Village shall be made on the per diem basis of not more than <br />seventy five dollars ($75.00) per day for the principal engineer and twice the <br />gross salary of subordinates for such time as they work on this project, but in <br />no case more than $75.00 per day, plus mileage at the rate of $0.08 per mile for <br />those automobiles driven in connection with the project, when actually engaged <br />in such work. We further propose to send to the Village Council all such time', <br />records as they may request, at such reasonable time as they request. A11 work <br />performed.by us shall be the property of the Village, including all dracaings, <br />reports, and original tracings except that we sha11 retain the right to p�ovide <br />facsimile of the tracings with the cost of reproduction therefor to be borne <br />be Che Village. <br />