My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC 04-25-1960
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
1960-1969
>
1960
>
CC 04-25-1960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:19:39 AM
Creation date
11/27/2006 9:03:17 AM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />i�,iIN`JTES OF F�GUIjAR 1�ETING <br />COUTICIL OF. TI'.E VILLAGE OF ARD�N HIZLS <br />^�Iondag, April 25, 1960 __ <br />The meeting was called to order by IvIayor Ashbach at 8;01 B. �I. <br />Roll Call: Present - Ashbach, Crepeau, Kennedy, Jones, Stromquist. <br />The minutes of the April 11, 1960 meeting vaere read and approved. <br />.Bids vrere opened by Clerk, Stromquist, and read b� En�ineer, Don Carley, <br />on the Floral Drive Road Improvement, Three bids were received. The <br />total bids as received wrere as i'ollows: C. S. MeCrossan, Inc.� A4pls. - <br />�16,611.75; T. A. Schifsky and Sons, Inc., North St. Paul - y�'11,201.15; <br />Jay W. Craig Co., Ivipls. -��`11,772.48. The engineer�s estimate was in the <br />ar�ount of �14,000.00. The.bids were referred to the Engineer for �abu- <br />lation and.study. 'r3is recommendations will be heard at tne meeting on <br />Pday 9, 1960. <br />The Public Hearing on the Fleral Drive Irr_provement was <br />questions or comments from the floor. Engineer Carley <br />special assesament hearing will be held vahen the job is <br />order to determine the cost sps°ead. S�tr. Kennedy moved <br />pi°oceed with tne improvement, subject to the report of <br />Seconded by Jopes. Carried. <br />held with no <br />stated tnat a <br />completed in <br />that the Village <br />the engineer. <br />Engineer Cas�ley presented tne con�ract for the Arden Hills #3 Road im- <br />•provement to the Council for their signatures. Jones moved_that the <br />contract by eigned, a�varding the contract to the Jay W. Craig Company, <br />P�:inneapolis. Seconded by Kennedy. Carried. <br />r,7r. Roger Short of Banister Engineering Company presented his report <br />on the proposed sanitary sewer for the Valentine Hills and Shorewood <br />Hills area. iJiaps and copies o£ tna report were distributed to the <br />Council members for ttieir study and consideration. <br />ivli�. Peter Popovich, Village i�ond Gonsultapt, was present and read tne <br />prOpared resolution approving plans and speci¢�ications and ordering ad- <br />vertisement i'or bids for Project 1 of Sanitary Se�ver Improvement �2. <br />Bids to be opened and considered by the Council at 8:00 P.��. on Mag <br />23rd, 1960 in the Village Hall. Kennedy int4rvduced and moved the adop- <br />tion of the resolution as attached. Seconded b5* Crepeau. Carried. <br />1�?r. Popovich read a second resolution approving plans and specifications <br />and ordering advertisement £or bids S'or Project 2 of Sanitary Sewer Im- <br />provement �2. Bids to be opened at 8:00 P.n". on Pviay 23rd at the Village <br />• Eall. icir. Jones introduced and moved the adoption oi tne resolution <br />as attached. Seconded by Crepeau. Carried. <br />A third re3olution was read by I�ir. Popovich approving plans and specificatic <br />and estimate of cost, and fixing the time and place of public hearing <br />on Sanitary Sewar Iiuprovement �4. Jones inti+�duced the resolution and <br />• moved its adoption as attached. Seconded by Crepeau. Carried. The <br />Public Hearing was set for May 25, 1960 at 8;0� P.Sv"1. at Lake Johanna School. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.