My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-07-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2007
>
01-22-07-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2007 9:23:24 AM
Creation date
2/14/2007 4:22:29 PM
Metadata
Fields
Template:
General
Document
Work Session Minutes
General - Type
Minutes
Date
1/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS CITY COUNCIL - January 22,2007 <br /> <br />2007 Proiects <br /> <br />2007 PMP Mill and Overlav: <br />As discussed at. previous Council meetings and in the feasibility report, the 2007 PMP <br />was expanded to include the streets proposed for the 2009 PMP. Some of the streets <br />originally suggested for mill and overlay are now being considered for seal coats. Spot <br />utility repair has been incorporated into the project, including items such as gate valve <br />repair, catch basin/manhole improvements, and sanitary sewer pipe repair. <br /> <br />Funding source: General Capital Fund, General Fund, Enterprise Funds (Watermain, <br />Surface Water, Sanitary Sewer), and Assessments. <br /> <br />2007 Seal coat: <br />The seal coat proj ect has been listed as a separate line item in the spreadsheet. These costs <br />are not assessed to residents, and for easier tracking, staff separated the costs from the <br />PMP costs. Based on the feasibility report, two additional neighborhoods have been <br />added to the proposed seal coat project: the Chatham Avenue neighborhood, and the <br />Harriet AvenueIPine Tree Drive neighborhood. The estimated costs for the 2007 PMP are <br />lower than staff originally anticipated, and balance the increase in costs for the seal coat <br />proj ect. <br /> <br />Funding source: General Capital Fund. <br /> <br />2008 Proiects <br /> <br />2008 PMP Reconstruct: <br />The proposed project for 2008 includes the neighborhood south of County Road E and <br />east of Snelling Avenue. The streets include: Arden Place, Forest Lane, Skiles Lane, <br />Glenarden Road, Glenarden Court, and North Snelling Avenue. Utility work will be <br />incorporated into this proj ect as needed. With the continuing increase in stormwater <br />requirements, it is anticipated that the stormwater costs will be the highest of the utility <br />costs. <br /> <br />Funding source: General Capital Fund, General Fund, Enterprise Funds (Watermain, <br />Surface Water, Sanitary Sewer), and Assessments. <br /> <br />The City of Arden Hills has received a request from the City of Roseville regarding its <br />next area for street reconstruction, the Asbury Avenue/ Ridgewood Road neighborhood <br />(Roseville's "Neighborhood 10"). City limits are midblock; some properties are even <br />divided by the border. Roseville would like us to consider the option of extending their <br />project up to Glenhill Road, which would include approximately 300 feet of Asbury <br />Avenue and 400 feet of Ridgewood Road located within Arden Hills. Estimated costs for <br />these segments are approximately $125,000, which includes some funding for storm <br />sewer improvements that will be needed. While the estimated costs for the 2008 PMP <br />exceed the $1 million guideline, 2007 and 2009 projects are estimated at less than $l <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.