My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-07-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2000-2009
>
2007
>
01-22-07-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2007 9:23:24 AM
Creation date
2/14/2007 4:22:29 PM
Metadata
Fields
Template:
General
Document
Work Session Minutes
General - Type
Minutes
Date
1/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS CITY COUNCIL - January 22, 2007 <br /> <br />million, creating a balance over three years. Given the close proxImIty of this <br />neighborhood to the proposed 2008 PMP, this would be another good candidate for <br />combining projects in an effort to reduce construction costs by creating a more lucrative <br />project for contractors. <br /> <br />2009 Proiects <br /> <br />2009 PMP Reconstruct: <br />Since streets previously proposed in 2009 were shifted to 2007, staff has shifted the <br />previously proposed 2011 proj ect to 2009. Past practice has been to alternate <br />reconstruction and mill and overlay projects every year. Since staff is not recommending <br />mill and overlays on streets with insufficient sub grade, this is resulting in more streets <br />that are in need of reconstruction than mill and overlay. Therefore, we are proposing <br />reconstruction projects in smaller neighborhoods in the "off" years to continue raising the <br />City-wide average PCI. This change may affect the enterprise funds, as mill and overlay <br />projects typically don't involve major utility work. <br /> <br />Funding source: General Capital Fund, General Fund, Enterprise Funds (Watermain, <br />Surface Water, Sanitary Sewer), Assessments. <br /> <br />2009 Seal coat: <br />Based on changes to the 2007 seal coat project, staff has made some minor revisions to <br />the proposed 2009 seal coat project. <br /> <br />Funding source: General Capital Fund. <br /> <br />2010 Proiects <br /> <br />2010 PMP Reconstruct: <br />No change has been made to the proposed improvements in 2010. <br /> <br />Funding source: General Capital Fund, General Fund, Enterprise Funds (Watermain, <br />Surface Water, Sanitary Sewer), State Aid Funds, Assessments. <br /> <br />2011 Proiects <br /> <br />2011 PMP Reconstruct/Mill and Overlay: <br />Staff reviewed projects preliminarily identified for 2012-2016 and selected a mill and <br />overlay project to shift to 2011 in an effort to continue capturing streets before they <br />deteriorate to a point of needing reconstruction. The proposed 2011 project involves the <br />Wyncrest and Nursery Hill neighborhoods. Amble Road is the only road within these <br />neighborhoods that does not have curb and gutter, therefore, it is proposed as a <br />reconstruct as a part of this proj ect. Utility repairs would be made as necessary. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.