My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-07-07-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2007
>
02-07-07-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 9:03:13 AM
Creation date
2/16/2007 9:55:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> , <br /> application, this particular application is more of a status check to confiml that the proposed lots <br /> on the preliminary plat confonn to the proposed lots on the final plat and that the conditions <br /> . applicable to thc Final Plat have been completed, <br /> Of the seventeen conditions imposed on the preliminary plat approval, eight conditions are <br /> required to be completcd or submitted bef'ore thc Final Plat is eithcr approved by the City or filed <br /> with Ramsey County (Attachment 3B-3). The eight conditions related to the tinal plat, which are <br /> listed by the condition number from the preliminary plat approval, and the status of those <br /> conditions is as follows: <br /> 2. Final Plat Submission. The applicant shall submit the final plat and application to the <br /> City of Arden Hills within thrce months of the preliminary plat approval date or the <br /> approval shall expire unless an extension is granted by the Planning Commission. The <br /> final plat shall reflect all applicable changcs in the conditions of approval for the <br /> preliminary plat. <br /> The final plat application submission deadline was December II, 2006, and the <br /> application was submitted on December 8, 2006. <br /> 4. Drainage and Utility Easements. The applicant shall include a 12 f'oot drainage and <br /> utility easement centered on all common lot lines, and a 12 foot drainage and utility <br /> casement along the right-of-way. <br /> 'fhc final plat meets or exceeds the minimum 12 foot drainage and utility easement <br /> . requirement (Attachment 3B-5). Much of Lot 2 and a portion of Lot 3 arc also included <br /> within the drainage and utility easement for thc stonmvater pond and wetland that arc <br /> scrving a section ofthc Ridge\Vood Ncighborhood to thc east. The City is responsible for <br /> maintaining the stonnwater pond and wetland within the easemcnt. <br /> In most cases, the City does not promote planting new vegetation in drainage and utility <br /> cascmcnts. Howevcr, given thc size of this easement, a condition has been added that <br /> would give thc property owner permission to plant additional vegetation within the City <br /> easement area with City Engincer and City Forester approval. <br /> 5. Park Dedication Fee. The applicant shall pay a park dedication fee as determined by the <br /> City Council at the time thc final plat is approved. <br /> Scction 1130.08 Subd, 2 of the Subdivision Ordinance permits the City to require all <br /> subdivisions to dcdicate a portion o[their land for recreation and conservation purposes, <br /> Depending on City need and the appropriateness of a land dedication in a givcn area, the <br /> City Council may require a park dedication fcc in lieu of a land dedication, Although the <br /> applicant is not proposing a land dedication. a subdivision resulting in t\VO new <br /> C'i(r of,.1 I'd, '11 !lills <br /> Plllllllillg CUflllI1issiUII ;\[('('lillgfi)1' Fcb/,/{lII'VI, }OO7 <br /> \'"\klr,,..ill[;l.L1s'ardenhilkI'Jalllnllg'-J'laJ1llin)! C'ases',20()("f!(,-()3'.1 J"hlul;n Fln'lll'lal (f'J":NI)I:--il.i,l\(I! ] (,(J7 .. PC RCI'(Ir1 - Lak" ,I.,hanna \\',)o,1s FlIlal <br /> . 1'131.d(ll' <br /> Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.