<br /> ('IP Discussion <br /> . 1118/2007 <br /> Page 3 <br /> Staff also attempted to uphold a neighborhood approach \vhen fCasible. In order to <br /> capture mill and overlay streets, staff developed a regional approach. The 2007 PMP <br /> includes mill and overlay streets in the southern portion and scalcoats in thc northern <br /> portion of the City. In 2009, the regions arc reversed. Thl' previous ('II' listed Snelling <br /> ^ venue to be constructed in 200X and the Glenarden ncighhorhood in 20 10. The current <br /> ('IP has reversed these t\VO projects. If Snelling ;\ venue was reconstll..lcted tirst. heavy <br /> tll..lck traHic would drive over new pavemcnt to access the Gknarden neighborhood, <br /> \vhich is not desirable. Postponing Snelling A venue to 20 I 0 also allo\Vs time to research <br /> and apply f()r possible grant opportunities l(:Jr the Snelling fhenue Regional Trail, as <br /> Council expressed an interest in constructing this in conjunction with the strcd <br /> reconstruction. <br /> MSA Pu)ject~ <br /> Based on the discussion Irom the April \York Session. stall has attempted 1<1 incorporall' <br /> the pwjects eligible I())' MSA funding into the .:i-year ('If> in the order of preference <br /> indicated by the Council. Funds arc available l(l/' a Cooperative Agreemcnt with l\'II1//)ot <br /> t()r the County Road E bridge project. Funding applications arc due in October. and if <br /> selected. the funds would be available tiJr fiscal year 2()0~: meaning the project would <br /> need to be completed by June 30, 200X. Staff would like to confirm that the Council <br /> . would like to pursue this funding. This project is currcntly shown in lOOK with the north <br /> side option. since this was Council's most recent direction. The south side option costs <br /> have been listed in the comments fix inl()rnlational purposes. <br /> J)~lrhs andBecreatjoll <br /> liard court surf~lce improvements have been included in the ('IP: the costs arc currently <br /> listed in the General Fund. based on the discussion at the last Council meeting and <br /> pending further analysis of the Park Fund. Staff is cutTently researching and developing a <br /> maintenance plan f()r City trails. Staff has postponed trail signage to 2008 to allow time <br /> for research and the development of guidelincs. Valentine Park improvements have been <br /> listed with "unassigned" projects. More analysis is needed to detennine a realistic scope <br /> oflhe project. as well as estimated costs. <br /> S(l.!1i1arv Se_\.yerJ)md- I&l,,-Litt Stati()J1s ~lJ1d SCJ\.n.b <br /> Based on the preliminary surcharge indicated by Met Council. $100.000 has been added <br /> to the UP each year. Staff will apply I()r credit for work to be done each year to avoid <br /> paying the surcharge to Met Council and allowing the funds to be spent directly tlll <br /> projects in the City. This mitigation work would include manhole repairs (scaling and <br /> raising), sanitary sewer pipe lining, and other related cff()rts to reduce 1&1. <br /> The lin station replacement scheduled t()r 200() and the possibility of acquiring SCi\Di\ <br /> are both listed with "unassigned" projects. Roseville is still researching options t(lr <br /> . SCADA upgrades. and still hopes to begin this work in 2006. Arden Hills would 110t be <br /> required ttl commit at the same time. and \vould have the option to join in later. i r we <br /> choose to. The remaining I(Hlr lift stations arc still functioning and can be properly <br />