Laserfiche WebLink
<br /> CIP Discussion <br /> . 1/18/2007 <br /> Page 3 <br /> the right to make adjustments to the policy as it deems proper. Th~ ass~ssment currently <br /> being proposed is based on the contractor's revised bid. <br /> The second item that Council should consider is how to address "through" lots as they <br /> relate to assessments: nothing is stakd in the assessment policy for such a lot. Several <br /> residents in the Ridgewood ncighborhood have expressed a conc~m on this issue. as they <br /> have properties that front Ridgewood Court and either Siems Court or Ridgewood Road. <br /> Properties ahutting Ridge\\'o(ld Court w~rc assessed in I ()9() I()r the mill and ovcrlay of <br /> the road and rcsidcnts have expressed concem about heing assessed twice for <br /> improvements. <br /> Both orthesc items \villlikcIy be hrought up at the assessment h~aring. The Council will <br /> need to respond to these conCCIllS: whatever is (kcided t"()r this proj~d may neate a <br /> prececlent for assessments on futurc projccts. Staff rccommends a Council discussion at a <br /> future work scssion to consider revisions to the assessment policy to morc clearly addrcss <br /> the above-mcntioned concerns. <br /> 2007 Proiects <br /> . The 1()llowing projects arc proposcd for 2007: anticipated funding sources hav~ bcen <br /> listed with each project. <br /> 2007 PMP M<-~O/Sea'-coat:i\s discusscd at the July Work S~SSi(1I1. staff is r~commending <br /> a rcgional approach to the mill and overlay and scalcoat projects over th~ next live years <br /> to capture these streets bd()I-e they slidc into a more expensivc maintenance category. ^ <br /> revised 5- Year CIP map lix 2007-20 II has been attached. No re\'isions were made to <br /> strccts proposed ti)r 2007 from previous cliscussions. Revisionslc)r other years are <br /> discusscd in thc section describing 20()~-20 11 projects. Spot utility repair will he <br /> incorporated into the projects. including items such as gate valve or hydrant repair <br /> (watcrmain), catch basin/manhole repair (storm sewer), and manhole repair or pipe lining <br /> (sanitary scwer). funding source: Gencral Capital Fund. (,cneral Fund. Enterprisc Funds <br /> (Watermain. Storm Sewer. Sanitary Sewer). <br /> (!l<;I1 hvy_1.9/J-'p Rail Bridgc~ As discussed previously. staff and Council havc agreed that <br /> while the railroad company is willing to cooperate on this project. it should he scheduled. <br /> Funding source: Special Revenue Parks Fund. <br /> St()!1l1 l\)I1d M~lil}telllJnc~: Stalf will cvaluate and develop a maintenance program to <br /> ensure that the i\lS4/SWPPP requirements are being met. Funding source: Storm Water <br /> Fund. <br /> . 1&1 Staff will continue to evaluate what necds to he done to reduce 1&1 and proceed <br /> accordingly. This mitigation work could include \vork such as manhole repairs (sealing <br />