My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-22-2006 Work Session
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 01-22-2006 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:29:06 PM
Creation date
2/16/2007 9:57:29 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ('IP Discussion . <br /> 1/18/2007 <br /> Page 2 <br /> 2007 Seal coat: <br /> The seal coat proj~ct has been listed as a separate line item in the spreadshcct. Thcsc <br /> costs are not assessed to rcsidents, and for ~asier tracking, staff separated thc costs from <br /> the PM? costs. Based on the feasibility report findings, two additional neighborhoods <br /> have been added to the proposed seal coat project: the Chatham 1\ venue neighborhood, <br /> and the Harriet Avenue/Pine Trec Drive neighborhood. The cstimatcd costs for the 2007 <br /> PMP arc lower than staff originally anticipated, and balance the increase in costs for the <br /> seal coat project. Funding source: Gencral Capital Fund. <br /> 2008 Projects <br /> 2008 PMP Reconstruct: <br /> The proposcd project for 2008 includcs the ncighborhood south of County Road E and <br /> east of Snclling Avcnue. Thc streets include: Arden Place, Forest Lane, Skiles Lane, <br /> G Icnarden Road, Glenardcn Court, and North Snelling A venue. Uti lity work will be <br /> incOlvorated into this project as nceded. With' the continuing increase in stollll\vater <br /> requircments, it is anticipated that the stormwater costs will be the highest of the utility <br /> costs. Funding source: Gen~ral Capital Fund, Gcn~ral Fund, Enterprise Funds <br /> (vVatcrmain, Surfacc Water, Sanitary Se\ver), Assessments. . <br /> The (,ity of Arden Hills has rcceived a request from the City of Roseville r~garding its <br /> next area for street rcconstruction, the Asbury A venue/ Ridgcwood Road neighborhood <br /> (Roseville's "Neighborhood 10''). [,ity limits are midblock; some properties arc even <br /> divided by the border. Rosevillc would like us to consider the option of extcnding their <br /> projcct up to Glenhill Road, which would include approximately 300 feet or Asbury <br /> A venue and 400 feet of Ridgewood Road locatcd \vithin Ardcn Hills. Estimated costs for <br /> thcse segments are approximately $125,000, which includes some funding for storm <br /> sewcr improvements that will be needed. Whilc the estimatcd costs for the 2008 PM? <br /> excecd the $] million guidcline, 2007 and 2009 projccts are cstimatcd at \css than S I <br /> million, creating a balance over three years. Givcn thc close proximity of this <br /> neighborhood to the proposed 2008 PMP. this would be another good candidate for <br /> combining projects in an effor! to reduce construction costs by creating a more lucrative <br /> project for contractors. <br /> 200t) Projects <br /> 2009 PMPJ3.econstruct: <br /> Since streets prcviously proposed in 2009 \vere shifted to 2007, stafr has shifted the <br /> prey iously proposcd 2011 proj ect to 2009. Past practice has becn to altcrnate <br /> reconstruction and mill and overlay projects every year. Since staff is not recommending <br /> mill and overlays on strects with no curb ami guttcr, thcre are more streets to reconstruct <br /> than therc arc to mill and overlay in the City. Therelare. wc are proposing reconstnlction . <br /> projects in smaller neighborhoods in the "off' years to continue raising thc City-widc <br /> average PC 1. This changc may affcct the enterprise funds, as mi II and overlay projccts <br />
The URL can be used to link to this page
Your browser does not support the video tag.