My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 12-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 3:46:44 PM
Creation date
2/16/2007 10:35:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> J~'ire Services: The LJFD capital budget is funded via our Public Safety Capital Fund. <br />. Under the funding fOllnula discussed with the City Council in September, the City of <br /> Arden Hills ,viII be paying 27.1 '% of capital equipment purchases in 2007 ($14,309). <br /> hems include: <br /> . Tires for the ladder truck, computer replacement, rescue equipment, positive <br /> pressure f~l11s, and a PTO generator on Engine I. <br /> Arden HilIs also pays the full cost of capital needs at Fire Station III ($35,UOO I()/' <br /> building repairs). The total budget for 2007 Public Safety Capital is S49,3()t) as requested <br /> by the UFO, plus $5,000 (or the City to conduct a needs assessment of Fire Station ifl. <br /> lt should be noted that sometime in 200() or 2007 we will also need to pay approximately <br /> $20,000 for 800 MHz radios. <br /> Mayor and City Coullcil Budget: A total of $4,000 is included for a contribution to <br /> Nort!nvest Youth and Family Services, plus an additional S] ,()()O for the Annual Meeting <br /> contribution. <br /> Protective Inspections Department: The proposed hudget includes a proposed S 15,000 <br /> to purchase a new soft\vare program and upgraded hardware to track permits. inspections, <br /> codc enforcement activities, and to provide more comprehensive and detailed reports. <br /> Planning Department: The City's updatL'd Comprehensi\'l~ Plan is due to the <br /> Metropolitan Council by September 2()()8. A large portion ofthis process will OCCllr in <br /> 2007. An amount of $40,000 has been proposed lor costs associated with preparation of <br />. thc Comp Plan Update. Most of the costs wiII be for professional consulting services. <br /> TC\AP Budget: The budget for consulting selTices has been increased by S 1 () 1.770 to <br /> cover consulting services related to TCAAP. The increase in the 2007 budget is due to <br /> anticipated increasc in developer reimbursabie expcnscs. H is expected tbat the developer <br /> will reimburse the City lor direct expenses incurred related to the Twin Cities Anny <br /> Ammunition Plant purchase and redevelopment. Stafr salaries that had previously been <br /> allocated to the TC;\;\P fund have been mowd back to their respccti\'e primary funding <br /> accounts. <br /> EDA: Within the EDA budget, $5,000 has been proposed te)r the Economic <br /> Development Commission (EDC) activities related to Business Retention. At this time <br /> the pmposed budget docs not include funding for any other initiatives included in the <br /> EDCs Strategic Plan. <br /> In the Administnltion budget. S I O.O()O has been included for a city-wide survey, and the <br /> budget (expenditure and revenue) for 2007 Celebrating Arden lIills has been removed. <br /> RCl'iscd 12/06dJ6 <br /> \ :ml'//'IJ-il1C'/\{//'{It'lIhills\Atlmill,Ci/r Admillis/""/r ),.;81/(Igd.~/}/) 7:81 ![!G/:T I {/(/I/ UG In;') Fill "I 1)('('. doc <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.