My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-11-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 12-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 3:46:44 PM
Creation date
2/16/2007 10:35:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Accessiblc Trees (Bid Pricing Includes Tree and Stump Rcmoval Cost)- . <br />. Precision Landscape and Tree-S25.00 (Per Diameter Tree Inch for Trces Under 35 <br /> Inches) <br />. Precision Landscape and Tree-$30.00 (Per Diameter Trce Inch fix Trees Over 35 <br /> Inches) <br />*Non-Accessiblc Trees (Bid Pricing Includes Trce and Stump Removal Cost)- <br />. Prccision Landscape and Tree-$35.00 (Per Diametcr Tree Inch for Trccs Under 28 <br /> Inches) <br />. Precision Landscapc and Tree-$55.00 (Per Diameter Trce Inch for Trees Over 28 <br /> Inches) <br />*Please note that non-accessible means any tree that needs to be removed and can not be <br />accessed by a vehicle. <br />All trces over 40 inches in all categories are subject to a special quote provision. <br />Excess Stump Rcmoval- <br />. Precision Landscape and Trec.-$4.00 Pcr Diamcter Inch <br />Woodpile Removal- <br />. Precision Landscape and Trcc-$20.00 Per Cubic Yard <br />Bmsh Removal- . <br />. Precision Landscape and Tree-$250.00 Per 20 Yard Load <br />Tree Pmning- <br />. Stcin Tree-$125.00 Per Hour (3 person crew and rclated equipment) <br />City stafThas also obtained the necessary certificatc liability of insurance forms from the <br />rccommcnded company. A background check has bccn completed by City staff for Precision <br />Landscape and Tree. <br />For comparison purposcs, City staff has also includcd a sprcad sheet identifying an overview of <br />the 2007 bid prices and a comparison of the 2006-2007 trec removal contract pricing. Pleasc note <br />that the only recommended cost increase for 2007 will be in the tree trimming category. This <br />increase howevcr should be minimal as Precision Landscape and Trce will typically deploy a <br />four person crew, \vhilc thc other contractors would typically deploy a three person crcw. <br />Recommendation <br />Based upon the lowest and most responsiblc bid, City staff recommends that City Council award <br />the 2007 Trce Removal and Related Services contract to Precision Landscape and Tree l()[ the <br />January I, 2007 to December 31, 2007 time pcriod. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.