My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-30-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 10-30-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:29:19 PM
Creation date
2/16/2007 10:38:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />::?006 PMP . <br />10/26/2006 <br />Page 2 <br />FINANCIAL IMPLICATIONS <br />The estimated costs in the most recent CIP revie\\'Cd by the City Council were S1,012,791, Staff <br />has estimated costs Il)r construction and engineering fl)r this project and included these in the <br />proposed 2007 hudget. The proposed project funding is as listed helow: <br />PIR: S 446,300 <br />General Fund (Streets): S200,000 <br />Storm Sewer ruml: S23,OOO <br />Sanitary Sewer Fund: S23,000 <br />\Vater Fund: sn,ooo <br />Total: $71 ).300 <br />The estimate for the water fund was originally listed as $ J 35,000, but further review by Public <br />Works staff indicated the improvemcnls in the proposed project areas are not as extensive as <br />were anticipated. Necessary improvements to all utilitics will be confinned during preparation of <br />the kasibility report. <br />The City of Roseville is offering engineering services at an estimated cost 01'$99,800, which is <br />included in the breakdown listed ahove. The cost for preparing the feasibility report (includcd in <br />the total engineering services estimate) is estimated at $10,000. URS provided an estimate for . <br />engineering services ft)r the project tt)r approximately $ I 35,000. <br />The feasibility report will only address the streets scheduled tt)r mill and overlay. The seal <br />coating porlion of the PMP is not assessed back to property owners, and \-vill be bid as a separate <br />contract. Stafr will be able to prepare and manage this project in-house. The estimated cost f()r <br />seal coating the streets proposed Itlr 2007 is $5 LOOO. This cost is not incOlvoratcd into the <br />figures listed above, hut is included in the proposed 2007 budget. <br />Contracting with the City of Roseville to complete these engineering services should provide <br />additional cost savings during plan preparation and construction. The project, if completed by <br />URS. would have additional project costs ft)r Roseville engineering staflto review and oversee <br />the work. If Roseville engineeling staff prepares the feasibility report, plans and specifications, <br />these review costs arc included as a part of the proposal. There is an opportunity ft)r savings <br />during construction by hidding Ihe project jointly with Roseville: Roseville also has a mill and <br />overlay project scheduled fll[ 2007. By hidding these projects together as one contract and <br />advertising early, we anticipate compctilive hids. Larger contracts and early advertisements tend <br />to create more interest trom contractors. <br />RECOl\ll\lENDEI> COUNCIL ACTION <br />It is recommended that the C\HlI1cil authorize preparation of the feasibility report and approve the <br />construction agreement with Ihe City or Roseville Itlr the 2007 PMP Improvements. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.