My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-30-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 10-30-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:29:19 PM
Creation date
2/16/2007 10:38:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> October 16, 2006 <br /> Ms. Michelle \Volfc <br /> City Administrator <br /> City of Anlcn Hills <br /> 1245 West lJighway 96 <br /> lHdcnHills,MI\ 55112 <br /> RE: 2007 PMP - Mill & Overlay Project <br /> Dear Ms. Wolfe, <br /> fhe following proposal is oJTered as a scoping document, estimated fees and schedule for the ahove- <br /> referenced projecl. <br /> GENERAL PRO.JECT SCOPE <br />. The proposcd scope of work includes services for preliminary engineering, preparation of tinal plans, and <br /> c.onstmction services for the proposed street improvements on the residential streets indicated in the City <br /> of Arden Hill's Capital Improvement Plan Ii:.lr the 2007 Pavement Management Program. <br /> BASIC SERVICES <br /> Design & Feasibility Report <br /> Rosevil1e will provide preliminary engineering services for the proposed projecl. Roseville will conduct <br /> field reviews of the project site as necessary and prepare presentation graphics and exhibits for puhlic <br /> infonnation. Rosevilk: will make modifications to the proposed improvement scope as directed by City <br /> staff :.md the Council. Roseville will prepare and conduct a neighborhood meeting during the preparation <br /> of the feasibility report in order to educate the public amI to promote project involvement with the <br /> residents. Roseville will present the findings of the feasibility report to City Council including the <br /> preparation of a presentation tix the Council at a formal Public} learing. <br /> FinalOl'sign <br /> Roseville will prepan~ final pl,ills and specifications for the project. City staJTwill provide as-built <br /> information as needed for the project. Final plans and specifications will he prepared to City standards <br /> and will include removal plans. utility reconstruction plans, grading plans, and details, as necessary for <br /> the 2007 Pavement Management Program. Final plans and specifications will be submitted to City statf <br /> for review and comment. Rosevillc will develop a presentation for the formal assessment hearing Ic))" the <br /> project near the completion of the final design phase. <br />. :l6bO Civic ('(,Illt'r Driw .:. gos('ville. iV1innesula 'is] 13 <br /> 6:;t 7'J:!-l{()SE .:. TI)[) 1>:>1-792 7:1'J'I .:. \V\Vw.ci.msevilk.mn.lIs <br />
The URL can be used to link to this page
Your browser does not support the video tag.