My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-30-2006
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 10-30-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:29:19 PM
Creation date
2/16/2007 10:38:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 2007 PMP-l\1i11 & Overlay ProJect <br /> Page 2 of 3 . <br />Bidding Phase <br />Roscvillc \vi II provide bidding phase services including submittal of advertisements for bids, bidding <br />documents, address contractor questions, issue addendums, and assist in conducting the bid opening. <br />Roscville will check the bids, provide detailed bid tabulation, and provide a recommendation of award to <br />City COllncil. <br />Construction Phase <br />Roseville will provide construction services. The services will include contract administration, field <br />inspections, construction meetings, ,md coordinate construction staking. Construction testing will be <br />coordinated by Roseville but will be provided by others and will be billed directly to Arden Hills by the <br />firm performing the work. <br />Ficld Survey <br />Field surveying will be completed for the project during both the preliminary and final design phases of <br />the project as well as for construction activities. It is anticipated that the design survey will include a <br />three point survey of pavements in specified intervals as well as any topographic points which will be <br />impacted by this project. Also, all existing utilities within thc project limits will be located in order to <br />verify location and elevation. This information will be used for the project and will be included into . <br />City's overall utility database. Conslruction surveying wi]] include a layout ot"thc centerline of roadway <br />for full dcpth mill and overlay locations only. All survey information wi]! be based upon the Ramsey <br />County Coordinate System in order to allow easy correlation with City GIS mapping infomlation. <br />ESTL\lATED COSTS <br />We propose that the basic services identi lied above be completed on a percentage of construction cost <br />basis consistent with the tenns of our Professional Services Agreement. The budgeted construction costs <br />for the project include approximately $562,000 of roadway improvements, S20,000.00 in stoml drainage <br />improvements and S20,000.OO in sanitary improvcments, and $20,000.00 in watellllain improvements. <br />The current estimate of the total construction costs for the project is approximately $622,000.00. <br />Estimated Engineering Fel's <br />The City ofRoscvil1c will hill the City of Arden Hills based on actual time spent (J.9 multiplier). The <br />estimated cost for engineering services on this project is $93,300. <br />Direct Expenses <br />Direct expenses for the project include items such as mileage, parking, photography, printing and delivery <br />services. Expenses are anticipated to include geotechnical consultant ($2,000) printing and distribution of <br />plans and spcci ficatiolls ($ 1,5(0), construction materials testing ($2,000) and mileage ($1,000). The total <br />estimated amount for direct expenses is $6,500.00. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.