Laserfiche WebLink
<br /> Pagc3of5 <br /> what I am proposing we do in 2007 and future years, However, to the extent that <br /> . we add staff or services specifically for TCAAP and identify a funding source, <br /> both the expenditure and the revenue will be budgeted in the TcAAP fund, For <br /> example, if we decide as a City to add a staffposition specifically to assist with <br /> the work load generated by TCAAP, and we negotiate the funding as part of the <br /> development agreement or some other mechanism, that would entirely be <br /> budgeted within that fund. <br /> 4. Attached is a revised version of the "Budget Highlights" document. In this <br /> document staff has attempted to capture key changes and highlights that would be <br /> of interest to the Council, or to anticipate some of the questions and concerns you <br /> may have. <br /> POTENTIAL BUDGET CHANGES FOR FURTHER DISCUSSION <br /> 1. StafThas suggested 1hat thc City consider conducting a resident survey in 2007, <br /> We have obtained a quote for such a survey and it will cost approximately <br /> $10,500. StatT is recommending that the Council direct stall to include funding <br /> for a survey within the 2007 budget. <br /> 2. In the Public Safety Capital budget, staff is recommending a Necds Assessment of <br /> Fire Station #1 during 2007. The Lakc Johanna Fire Board has also <br /> recommended that we conduct an assessment. As Council has previously been <br /> infonned, the Fire Depm1ment is planning for potential reconstmction of Fire <br /> Station # I (eunently contemplated in the Fire Capital Plan for 2012.) I am <br /> . recommending a needs assessment in order to more accurately assess the status of <br /> the building so that we can morc adequately plan for the timing and cost of either <br /> repairs/remodeling or reconstmction. Staff has obtained preliminary quotes from <br /> experienced engineering/architectural firms and projects the cost for such an <br /> assessment to be approximately $5000, Staff recommends adding a $5000 budgct <br /> amount in the Public Safety Capital fund for this purpose. <br /> ], The proposed budget still incorporates funding for cclchrating Ardcn J-lilIs, <br /> Included is $50,000 in expenditures and $22,000 in revenue for a net of $28,000. <br /> Without further dircction from Council, we have not adjusted the budget for 2007, <br /> While there has been discussion about downsizing the event for 2007, we do not <br /> have agreement a1 this timc about the scope of the downsizing, so I have been <br /> reluctant to adjust the budget. <br /> 4, Thc EDe has presented a Strategic Plan that recommellds a number of items for <br /> 2007 implementation. The only itcm that has becn incorporated into the budget at <br /> this time is $5,000 in the FDA fund for Business Retention Program activities. <br /> GENERAL FUND AND TAX I.EVY DISCUSSION <br /> The current proposed budget is based on a 6% increase in the tax levy from $2,523,737 to <br /> S2,675,161. A percent in the increase of the tax levy is $25,237. The City has hired <br /> Ehlers and Associates to prepare a Financial Plan for the City, to assist us with assessing <br /> our current financial status and with making decisions regarding the 2007 budget and tax <br /> levy. My primary concern is that while our operating costs can be covered with a 4(% <br /> . increase in the tax levy, our fund balances in capital funds arc decreasing (due to <br /> significant capital improvement projects) and we need to ensure the viability of1hose <br />