My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-30-2006 (2)
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 10-30-2006 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:29:25 PM
Creation date
2/16/2007 10:49:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Administrator/Staff Comments: , <br />When the City of Arden Hills contracted with the City of Roseville for engineering services, we anticipated many' <br />benefits. One of the objectives was to have the staff engineers review work requests and determine whether or <br />not the work could be done in-house or if we needed to assign the work to our consulting engineers. Th~ 2007 . <br />PMP project offers an excellent opportunity to make use of the in-house resources available to us, providing a <br />cost savings for the project. The savings will initially result from the preparation of the feasibility report, which can <br />be prepared in-house at a lower cost. An additional savings may result by bidding both cities' 2007 projects <br />together as one. <br /> . <br /> . <br />]\klhl-lIll.1.11~ cu<knlllll.<.. PI~(\..P\\. r nt:llln"IT1~~ ~fl()(, Cllup,(il :\(ll(;n~.; IlJ-:~O.fJh :~(J(I~: f'J\1P Ordl'T h.<L"jbilil~ de,l' <br />
The URL can be used to link to this page
Your browser does not support the video tag.