My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-30-2006 (2)
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2006
>
CCP 10-30-2006 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:29:25 PM
Creation date
2/16/2007 10:49:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. ~ <br /> ~ EN HILLS <br /> 1\IEMORANnlJM <br /> DA 1'E: October 13,2006 AGENDA I1'EI\I 7.A <br /> TO: Mayor and City Council <br /> Michelle Wolfe, City Administrator <br /> FROM: Kristine Giga, Civil Engineer ~/ <br /> SL B.JECT: 2007 PM J> Improvemcnts- Ordcl" Fcasihility Report and Approve <br /> Constnll,tion A~rcemcnt n'ith the City of Roscvillc <br />. <br /> BACKGROUND <br /> Slaifhas disclIssed the 5-year CiP and Pavement Management Program with the City Council at <br /> seHTaJ \Vork Sessions this year. In (lrdcr to move tc.)f\vard with the 2007 PMP and advertise the <br /> project early in 2007 to obtain competitive hids, staff is requesting Council authorize preparation <br /> nfthe feasibility report at this time. Staff has reviewed this project, and has detennined that this <br /> wnrk muld bc done utilizing City of RosevilJe engineering staff as opposed to contracting with <br /> the consulting engineers, lJRS. to complete this work. The advantages of this proposal will be <br /> discussed \all"- in this memo. <br /> DISCl.'SSION <br /> As has been discussed, Council has expressed the desire to complete maintenance on City streets <br /> that. if negkcted I(H" too long, would need to be reconstructed. Then:;f(lI"e, staff proposed that the <br /> 2007 PMP improvemCllt project consist of mill and overlay and seal coating. Attached is a map <br /> which shows the proposed street improvement projects fix 2007-201 I. As part of the preparation <br /> ()t"the fcasihility report. stalfwiJl examine the proposed streets, gather inf(mnation on the section <br /> of the street by ohtaining soil borings, and dctennine the appropriate maintenance for each street <br /> segment. <br />. <br /> ~ktn>-IIl<'llIvarckllhills-I'R",P\V -Ln~inc'c'llIll' _::'OOh-C..uncil -'\l'IH'ns--IO-2_1-0h 'V!cIllO \ lnkr 21107 I'MI' I'c"asihtlily_dc>c' <br />
The URL can be used to link to this page
Your browser does not support the video tag.