Laserfiche WebLink
<br />that utilized additional aggregate base CL 5 was for specific locations which required a thicker section of base in order to <br />correctly match into existing driveways, Particularly in areas where the roadway was being lowered, extra CL 5 was <br />needed to smoothly transition into existing areas. These areas included portions of Siems Court, Ridgewood Road, and <br />Skiles Lane and equated to an additional 266 tons for a total of 1,386 tons of additional aggregate base CL 5, <br /> <br />The special walk item is used for the reconstruction of resident owned walking surfaces or stairs damaged during <br />construction, Due to either unforeseen field conditions or specific requests by residents, three additional properties <br />reqnired either walking surface or stair reconstruction, two on Siems Court on one on Skiles Lane, <br /> <br />The project specifications indicate that bituminous density is to be tested for all roadways, The density should meet the <br />standard specifications of MNIDOT requirements. If the density exceeds the MNIDOT requirements, a bonus is given to <br />the Contractor, conversely, if the density is below the MNIDOT requirements then deductions are imposed. The density <br />tests for the bituminous on this project showed that overall the densities were below the MNIDOT requirements which <br />means a deduction shall be imposed. This is shown as a lump sum item below, <br /> <br />1. Subgrade Excavation 3,474 CY <br />2, Select Granular Borrow 145 CY <br />3, Aggregate Base, CL 5 1,386 Ton <br />4, Modular Block Retaining Wall 283 SF <br />5, Special Walk 213 SF <br />6, Bituminous Density IncentivelDisincentive <br />Subtotal Schedule A - Roadway <br /> <br />$ 12.34/CY <br />$ 14,22/CY <br />$l1.52fTon <br />$20.60/SF <br />$ 12.40/SF <br />Lump Sum <br /> <br />$42,869,16 <br />$ 2,061.90 <br />$15,966.72 <br />$ 5,829,80 <br />$ 2,640,00 <br />($6.739.34) <br />$62,629.44 <br /> <br />Schedule B - Storm Drainage <br />There were Contract Items where additional quantities were needed to complete construction, these items include: <br />raingarden grading and sodding, type lawn. The raingarden grading item over-ran the contract quantity because of resident <br />requests regardiug size or shape and also because two raingardens were dug deeper than specified in the plans in order to <br />create the most efficient drainage situation possible. The sodding, type lawn item over-ran the contract quantity because <br />work along Lake Johanna Boulevard was more difficult than originally anticipated due to the fact that the actual location of <br />existing private utilities covered a broader area than what was identified by the utility companies, Consequently, storm <br />sewer construction and dirt spoil piles impacted a larger area which then required more restoration and sodding, <br /> <br />There was also a change in the size of the culvert pipe draining the wetland south of Lake Johanna Boulevard to Lake <br />Johanna. The original plan had a 29"x18" concrete arch pipe which was changed to a circular 30" pipe. The 30" concrete <br />pipe quantity was accounted for in Change Order No. 1 while the two pipe aprons and trash guards were not. The pricing <br />for the 30" aprons and trash guards is higher than the 29"x18" and so the approved prices are included below. <br /> <br />Items 5 - 9 below represent lump sum work items for proposed storm sewer performed by the Utility Contractor during <br />construction. These were regarded as necessary due to unforeseen existing conditions and approved by the City during <br />construction, The description of the lump sum items are included below: <br /> <br />1. Raingarden Grading 88.7 CY $ 14,OO/CY <br />2. Sodding, Type Lawn 708 SF $3.20/SF <br />3. 30" RC Pipe Apron 2 Each $2,492/Each <br />4, Trash Guard for 30" Pipe Apron 2 Each $l,OOl/Each <br />5, Modification of Catch Basin 6-1 and 12" outlet pipe to accommodate <br />existing sanitary sewer service <br />6. mstallation of 4" pipe drain from raingarden to Manhole 3-5 <br />at Arden Place and Ridgewood Road <br />7, mstallation of additional Catch Basin adjacent to Manhole 1-3 <br />at Siems Court and Lake Johanna Boulevard <br />8, Replacement of newly installed Catch Basin 6-1 with a 48" <br />Manhole to better align with curb <br />9. Modification of Catch Basin for 8-1A and 8-3A to better <br />match curb elevation <br />Subtotal Schedule B - Storm Drainage <br /> <br />$ 1,241.80 <br />$ 2,265.60 <br />$ 4,984.00 <br />$ 2,002.00 <br /> <br />$ 1,504.20 <br /> <br />$ 1,044.40 <br /> <br />$ 2,453.56 <br /> <br />$ 1,518.60 <br /> <br />$ 57LlO <br />$17,585.26 <br />