My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-07 Item 4F, Arnt Construction Change Order 3
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
03-12-07-R
>
03-12-07 Item 4F, Arnt Construction Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:43:35 PM
Creation date
3/9/2007 4:14:27 PM
Metadata
Fields
Template:
General
Document
03-12-07 Item 4F, 06 PMP Project Change
General - Type
Agenda Item
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Schedule C - Watermain <br />The 5 items listed below represent lnmp sum watermain work items approved by the City during construction and <br />performed by the Utility Contractor, These work items were regarded as necessary due to unforeseen existing conditions. <br />The description of the Inmp sum items are included below: <br /> <br />I. Repair existing water service near 1450 Skiles lane <br />damaged during construction <br />2. Repair and relocate damaged water service behind proposed <br />retaining wall on Ridgewood Road <br />3. Repair and relocate damaged water service behind proposed <br />retaining wall on Siems Court <br />4, Remove and replace 8" gate valve at SE comer of Lake <br />Johanna Boulevard and Ridgewood Road <br />5. Disconnect and replace water service at 3535 Siems Court <br />Subtotal Schedule C - Watermain <br /> <br />$ 2,186.63 <br /> <br />$ 1,678.98 <br /> <br />$ 2,048.00 <br /> <br />$ 4,582.20 <br />$ 396,78 <br />$10,892.59 <br /> <br />Schedule D - Sanitary Sewer <br />The 7 items listed below represent lump sum sanitary sewer work items approved by the City during construction and <br />performed by the Utility Contractor. These were also regarded as necessary due to unforeseen existing conditions, The <br />description of the lump sum items are included below: <br /> <br />I. Repair existing 8" sanitary sewer conflicting with proposed <br />storm sewer between manholes 6-4 and 6-2B = <br />2. Lowered sauitary service conflicting with proposed 12" <br />storm sewer at 3551 Ridgewood Road = <br />3. Lowered sanitary service conflicting with proposed 12" <br />storm sewer at 1556 Arden Place = <br />4, Remove sections of two sanitary sewer manholes on Lake <br />Johanna Blvd and replace with barrel sections to match grade = <br />5. Remove section of a sanitary sewer manhole on Ridgewood <br />Road and replace with a barrel section to match grade = <br />6. Remove section of a sanitary sewer manhole on Siems <br />Court and replace with a barrel section to match grade = <br />7. Repair damaged 12" sanitary sewer line along Old <br />Snelling Ave and Arden Place = <br />Subtotal Schedule D - Sanitary Sewer <br /> <br />$ 2,323.47 <br /> <br />$ 785.50 <br /> <br />$ 1,590.34 <br /> <br />$ 6,923.53 <br /> <br />$ 1,903.87 <br /> <br />$ 930.28 <br /> <br />$ 913.18 <br />$15,370.17 <br /> <br />CHANGE ORDER SUMMARY <br /> <br />Schedule A - Roadway <br />Schedule B - Storm Drainage <br />Schedule C - Watermain <br />Schedule D - Sanitary Sewer <br /> <br />$62,629.44 <br />$17,585.26 <br />$10,892.59 <br />$15,370.17 <br /> <br />$106,477.46 <br /> <br />Total Contract Modification for Change Order No.3 <br /> <br />End of Change Order No.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.