My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-07 Item7B, Review of 2006 Joint Powers Agreement with Roseville
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
03-12-07-R
>
03-12-07 Item7B, Review of 2006 Joint Powers Agreement with Roseville
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 3:46:02 PM
Creation date
3/9/2007 4:22:31 PM
Metadata
Fields
Template:
General
Document
03-12-07 Item 7B, Engineering Review
General - Type
Agenda Item
Date
3/12/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2006 PMP <br />3/8/2007 <br />Page 3 <br /> <br />Total Civil Engineer $5,431.48 (102,5 hours) <br />Total all employees $9,248.80 (302,75 hours) <br />Total project costs to date $15,209.03 <br /> <br />At the end of2006, the plans and specifications for this project were at 65% <br />development. As a result, we anticipate that design and feasibility studies cost will be <br />less than anticipated in the scoping document. We approached this proj ect with the intent <br />to save both cities money, <br /> <br />· For the City of Arden Hills the savings are mainly in engineering costs, This is <br />accomplished through engineering rate, Roseville's 15% vs, URS's 22% of the <br />project costs, Cost savings were also achieved by having the Civil Engineer as a <br />direct project cost instead of an oversight project cost, where her hours would be <br />billed over and above the project's 22% engineering costs, <br /> <br />· For the City of Roseville it is through construction costs, we can achieve <br />economies of scale in pursuing a joint project for bidding this spring, <br /> <br />2006 Hours Summary: <br /> <br />As shown on the following table, the conditions ofthe total staff hours committed to in <br />the JP A, 1670 hours, was fulfilled in 2006, These totals include all work completed by <br />the City ofRoseville in 2006, including work on the 2007 PMP, <br /> <br /> Actual <br />Engineering hours (not Civil 413,83 <br />Engineer) <br />Civil Engineer hours 1526.50 <br />Total hours 1940.33 <br /> <br />We believe our first year has been a success, On the whole, we have achieved added value for <br />both of our cities with this Joint Powers Agreement. <br /> <br />Anticipated Activities/Goals for 2007 <br /> <br />Some of the more notable goals and activities we are anticipating for 2007 are: <br /> <br />. <br /> <br />2007 PMP Mill and Overlay Project <br />2007 Seal coat Project <br />Begin work on the 2008 PMP reconstruction project <br />Continue updating the Five-year Capital Improvement Plan <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.