My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-07 Full Agenda Packet
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2007
>
04-16-07-WS
>
04-16-07 Full Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2022 4:14:43 PM
Creation date
4/16/2007 11:11:40 AM
Metadata
Fields
Template:
General
Document
04-16-07 Agenda Packet
General - Type
Agenda Packet
Date
4/16/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~ <br />EN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />April 11, 2007 <br /> <br />AGENDA ITEM B2 <br /> <br />TO: <br /> <br />Mayor and City Council <br />Michelle Wolfe, City Administrator <br /> <br />Kristine Giga, Civil Engineer N#I <br />Greg Hoag, Public Works Director~ <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />2006 PMP Update (Siems Court/Lake Johanna Boulevard Intersection) <br /> <br />BACKGROUND <br /> <br />Last fall, residents of the 2006 PMP Ridgewood Neighborhood approached the City Council at <br />the October 30, 2006 City Council meeting with a request to review the intersection of Siems <br />Court and Lake Johanna Boulevard. A written request was signed by 29 residents representing <br />19 properties to widen the intersection and/or schedule a neighborhood meeting to address the <br />concerns regarding the intersection. There are 62 properties in the Ridgewood neighborhood. A <br />copy of the signatures is attached, as well as excerpts from the minutes of the October 30, 2006 <br />and November 13, 2006 City Council meetings. <br /> <br />DISCUSSION <br /> <br />At the direction of the City Council, staff looked at widening the entrance and associated <br />construction costs. Attached are four alternatives; the cost estimates are listed in the table below. <br />Alternatives I and 2 were based on staff suggestions in an attempt to provide a low-cost <br />reconfiguration. Alternatives 3 and 4 are based on suggestions received by the residents for a <br />possible reconfiguration. Another alternative is to do nothing and leave the intersection as it is <br />today. <br /> <br /> Surmnary Estimated Cost <br />Alternative I Remove curb and gutter north of catch basins, results in $5,755 <br /> increase in oavement width from 65' to 78' at the entrance. <br />Alternative 2 Remove curb from west side, relocate catch basin, reconstruct $12,150 <br /> curb, results in increase in pavement width from 65' to 90' at <br /> the entrance. <br /> <br />\\R VNAS 1 \AHdata$\PR&PW\Engineering\2007\ Work_ Sessions\4-16-07 _Memo _ 2006PMP _ SicmsCt.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.